My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT - ROSITA PARK LIGHTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
25G - AGMT - ROSITA PARK LIGHTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:50:38 PM
Creation date
9/27/2019 4:09:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25G
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Energy Network <br />Appendix A: Lighting Inventory <br />Site Dewriptlon <br />Exhiir, Light, Sytlam <br />Boosted Lighting System <br />Title 24 <br />Requlmmantat— <br />ITEM k <br />Locatlon antllor Room C <br />Room Type <br />Solutlon <br />Fst Coal <br />Fixture cascdpllon <br />Es. Pst <br />Ex. hWl <br />Ex. Total <br />Propoaed Fixture Description' <br />Pmp <br />Fist <br />Omupenq <br />Bodoni <br />Cade <br />Cly." <br />Fxt <br />kyi <br />Qi <br />Ephesus 551 Spons Lighting <br />6] <br />N <br />1 <br />Ball Field <br />Exterior <br />LT-85834 <br />HPS1000PM <br />1000W HIPS Story Lighting -Pole Mount <br />67 <br />1.ID <br />_ <br />AD-550-&IB46ELK ""' <br />Eye Lighting saw LEDIOC Retrofit <br />16 <br />N <br />2 <br />Pad walkways <br />Eztenor <br />LT-11322 <br />MM250PM <br />25OW Metal Halide Pole Mount <br />16 <br />0.30 <br />LE5-50-740-HWIn x UNV- <br />R 1352W Flood Light+MS <br />23 <br />y <br />3 <br />Building Extent <br />Exterior <br />LT-19132 <br />MH175WM <br />175W Metal Halide Wall Mounted Floods <br />23 <br />0.22 <br />FFLED52N * SMS56O <br />*The Contractor is responsible for finalizing fixture model numbers <br />**The Contractor is responsible for confirming all fixture counts, pre and past case. <br />* **The Contractor is responsible for confirming Title 24 compliance for all applications, including installation of Occupancy Sensors where applicable. <br />--*The Contractor is responsible for the setup, calibration, and positioning of the Ephesus Lighting Fixtures <br />*****The Contractor is responsible for determining which optic to use on the Ephesus Lighting Fixtures <br />"en er"' ne Vhl.:nt ,i 12-6 <br />1 a*5 emsr � ,.t.a�rr.en, <br />25G-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.