My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65A - WATER - SEWER RATE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
65A - WATER - SEWER RATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:52:51 PM
Creation date
9/27/2019 4:09:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
65A
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer Rate Study Recommendations <br />October 1, 2019 <br />1 <br />2019 Sewer Rate Study Drivers <br />Schedule: <br />• The last rate study was completed in 2014 <br />• The last adopted rate adjustments were for FY 2019 (last year) <br />Legal: <br />• Recent court decisions have "raised the bar" for transparency and cost -to - <br />service requirements for water rates (Prop 218). <br />Rate Structure: <br />• Revenue is being un-necessarily affected by drought events <br />System Needs: Sewer system has significant capital investment needs. <br />• Currently averaging less than 1 mile of sewer line replacement per year <br />• Proposed plan jumps sewer line replacement to an average of 4 miles a year <br />2 <br />2 <br />Stantec Consulting & Hildebrand Consult15A-1 7 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.