My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-10-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
FULL PACKET_2019-10-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 9:46:55 AM
Creation date
9/30/2019 8:45:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/1/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1033
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br />A"1 TACIiIV6Ef" T 1 <br />SCOPE, OF WORK <br />C I I Y OF SANE A AN <br />RI[iQU(:S"f FOR P[wpOSALS <br />IOR <br />I,1011I ING REFRO U 11 SA IA AN 1 ST.ADIUNI <br />R.FP NO.: 19-058 <br />Project Duration: 4 Weeks <br />Mobilize: On deliver date of Sporn Lights <br />Scope: Bid Item #1 Exterior <br />Receive IVInSCO Lighting deliver* trucks &. store in Bin onsite <br />Demo (1 19) Musco Fixtures & arms on existing pole & disuow of <br />Demo Platforms;Caging on each pole using crane & li 11 <br />Weld hangeis to pole for driver box attachment <br />Weld =4" huh in pole to gain access into pole at driver Lox location <br />Install Driver Boxes <br />Assemhlo Ntusco Arms & (62) Fixtures and liftto position with crane <br />Install Musco Wire harnesses, terminate &, test <br />Clean up site <br />City oI Santa Ana REP 19-Qf8 <br />Page 12 <br />20B-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.