My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-10-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
FULL PACKET_2019-10-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 9:46:55 AM
Creation date
9/30/2019 8:45:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/1/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1033
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes <br />Quote is based on: <br />• Shipment of entire project together to one location <br />• 48D Volt, 3 Phase electrical system requirement, to be confirmed prior to production <br />• Structural code and wind ,peed = 2016 CBC„ L10 mph, Exposure C. <br />• Confirmation of pole locations prior to production. <br />• The owner of the field Is responsible for the structural integrity of the existing poles. <br />Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional <br />details. <br />Mike Marchetti <br />Musco Sports Lighting, LLC <br />3002 Dow Ave., 0504 <br />Tustin, CA 92780 <br />Phone, 949-754-0503 x6111 <br />E-mail: mlke.rttarchetti@musco.corn <br />„swt« gr�o�q ere <br />20B-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.