Laserfiche WebLink
California Professional Engineering, Inc.3 <br />-DLLM zt %� vaxd r/icctat:os,�- =4 <br />k <br />Traffic Signal References <br />County of Los Angeles Department of Public Works <br />Aviation Blvd j 1181h StrootlNorthrup Grumman Avenue to Ocean Drive #TSM0010190 <br />Originai Contract Amount, $1,352,897 25 <br />Final Contract Amount: $1A15.076.67 <br />Approximate StantEnd Dates; September 2016 —April' 2018 <br />Brief Description of Work Traffic Signal installatkinlModifications at multiple intersections along Aviation Blvd including new traffic signal <br />poles and vehicultiopedestrian traffic gear. new controller cabinets with new foundations, new service; pedestals with new foundations, <br />battery backup installation, video detection system installation, safety lighting installation emergency vehicle preemption installation, now <br />ads compliant curb ramps, new striping and markings, loop detection systems, new underground conduit and pullbox installatlon, SCE <br />underground substructures, concretelasphaft improvements, etc, <br />Florence <br />Final <br />Approximate StarttEnd Dates: August 2017 — September 2018 <br />Brief Description of Work Traffic Signal InstaUationlMpdifications at multiple intersections along Florence Avenue including new traffic <br />signal poles and vehloalaripedestrfan traffic gear, new controller Cabinets with new foundations, new service pedestals with new <br />foundations, battery backup Installation video detection system installation, safety lighting installation, emergency vehicle preemption <br />instaallaton new ada compliant curb ramps, new striping and markings, loop detection systems new underground conduit and pullbox <br />installation, SCE underground substructures, concrete/asphalt improvements, etc, <br />Colima Road i Camino <br />Email: JZARA@dpw,lacounty.gov <br />Approximate Start/End Dates: January 2017 — October 2018 <br />Brief Description of Work: Traffic Signal instaltationlMoUijications at multiple intersections along Colima Road includingnow traf(Ic signal <br />poles and vehicularlpedestrian traffic gear, new controller cabinets with new foundations, new serviae pedestals with new foundations, <br />lottery backup installation video detection "system installation safety lighting installation, emergency vehicle preemption installation new <br />site compliant Curb ramps new striping and markings, loop detections systems, new underground conduit and pullbox installation SGE <br />underground substructures, SCE underground substructures, coneretelesphaltimprovements :etc, <br />Countyof Los Angeles Department of Public Works <br />Florence -Firestone Community Safe Routes to School# RDC0016046 <br />Original Contract Amount. $708,395 78 <br />Final Contract Amount. $733.074.89 <br />Contact: Robert Eisenhamer <br />Main; 626,468,3166 <br />Email: REISENHA@dpw lacoumy,gov <br />929 otterbein Avenue, Unit E. i a Puente, CA 91 W 1 Ph (626) 810-1338 Fax: (626) 810-1322 1 Email: estimating@cpengineeringino.ccm <br />