My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2021 2:18:30 PM
Creation date
10/10/2019 4:26:24 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
A-2019-174
Agency
PUBLIC WORKS
Council Approval Date
10/1/2019
Expiration Date
10/1/2022
Insurance Exp Date
5/19/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Appendix <br />ATTACHMENT 4 <br />PROPOSAL ITEM PRICINC <br />PROPOSERS CERTIFICATION and PROPOSAL ITEM PRICING <br />Certification - I certify that I have read', understand and agree to the terms and conditions of this <br />Requestfor Proposals. Ihave examined the Scope of Services (Appendix -Attachment 1) and am <br />familiar with the scope of work locations. I am familiar with all the existing conditions and limitation <br />that may impact work requests. I understand and agree that I am responsible for reporting any <br />errors, omissions or discrepancies to the City for clarification prior to the submission of my <br />proposal <br />Proposal Item Price . Pricing shall be based on hourly cost, time and materials basis for services <br />described in Attachment I- Scope of Services. Fee must be inclusive of all costs, including but <br />not limited to, direct and indirect costs for labor, overhead, incidental supplies, travel mileage, <br />and fuel. Any special materials will be purchased by the contractor only after discussed and <br />authorized by the City projects manager or designee in writing. <br />Labor .t <br />Item <br />Description <br />Hourly <br />Hourly <br />Overtime <br />Hourly <br />Doubletime <br />1 <br />Laborer <br />e <br />. � <br />1 -3o <br />2 <br />Apprentice <br />os <br />90- %t <br />Vo <br />l . <br />3 <br />Journeyman <br />ap• , <br />7 "•— <br />ono <br />4 <br />Foreman <br />f2 •sue <br />fz <br />Zl . M <br />Material '', <br />Item <br />Description <br />Unit <br />Unit Price <br />5 <br />2" Conduit PVC Schedule40 <br />LF <br />6 <br /># 8 AWG Wire (Copper) <br />LF <br />7 <br /># 10 AWG Wire (Copper) <br />1-1- <br />8 <br /># 12AWG Wire (Copper) <br />LF <br />—� <br />9 <br /># 6AWG Overhead Wire Aluminum <br />LF <br />10 <br />Meter Pedestalper COSA Standard <br />EA <br />c7 ' =� <br />11 _____ <br />Streetl' ht Pole per Sid 1126A Double King)g) <br />EA <br />12 <br />Streetli ht Pole per Std 1126E (Single King)EA <br />13 <br />1 Streetii ht Poleper Std 1126H (Marblelite) <br />EA <br />0 <br />Equipment <br />Item <br />Description <br />Hourly Rate <br />Daily Rate <br />14 <br />Service Truck <br />pp <br />15 <br />50` Boom Truck <br />16 <br />Crane Truck <br />DC> <br />CONTINUED ON THE NEXT PAGE <br />City of Santa Ana RFP 19-042 <br />Page A4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.