Laserfiche WebLink
4 r J <br />UNIT RATE <br />Mercury meter •Lumexmotor 2528 <br />Day <br />88DOO <br />Mercury Meter -Jerome Meter 2530 <br />Day <br />550.00 <br />Mercury Vacuum/1-IeleaVacuum 2532 <br />Day <br />71.5.00 <br />Chlorine Emergency Kit "A" 2534 <br />Day <br />962.50 <br />Chlorine Emergency Kit"B° 2536 <br />Day <br />1072.50 <br />Chlorine Emergency Kit "C" 2538 <br />Day <br />1292.50 <br />PID/HNU/OVA Meter 2540 <br />Day <br />220.00 <br />Radiological Meter 2542 <br />Day <br />275.00 <br />SCBA 2544 <br />Day <br />198.00 <br />SCBA, Standby Only 2546 <br />Day <br />110.00 <br />Tripod and Winch 2548 <br />Day <br />247.50 <br />Traffic Control, Arrow Board 2550 <br />Day <br />357.50 <br />Traffic Control, Reflective Signs 2552 <br />Day <br />55.00 <br />Traffic Cones/Delineators 2554 <br />Day <br />5.50 <br />Notes., <br />1. Equipmentphces do not Include fuel, operator, ormoblilzatlon to Job SIM Minimum call Calls 4 hours. <br />2. All charges are portal to portal beginning with equipment mobilization from Patriot Operations Centers end Includes all time at <br />the site, whether or not equipment Is listed In dailyreports or actively utilized, Time charges terminate at the conclusion of the <br />operation, which includes demobilization back to operations Centers and completion of any decontamination, restocking and or repair. <br />3, Day rate equipment operated over 12 consecutive hours will be Charged 2x the day rate. <br />4. Projects over 50 miles from Patuot'e Officewill front, mileage charges of.50.60 per mile per vehicle. <br />5. Equipment not on price list will be charged per quote. Unless otherwise quoted, equipment not on price list Will be Charge <br />at Cost <br />plus twenty Percent t(20%). <br />6. Glint agrees to Pay Patriot in aceoldance with rates contained In this Price List, for any cleaning or repairs necessary <br />to return <br />equipment to the same condition as at the Commencement of services. Only Patriot shall perform any cleaning and <br />decontamination operations on all equipment owned, rented or subcontracted by Patriot <br />T. All equipment and supplies are subject to a replacement charge at Pa trial cost+ 20%if damaged, or if decontamination Is impossible: <br />8. Services shall be performed by employees of Patriot, or its subcontractors who will be controlled and under the sale authority of <br />Patriot, and who will be compensated for performance of the services directly ey Patriot under the terms and Conditions of their <br />agreements with Patriot. Patriot wit) be responsible for the qualification of any subcontractors used to perform services on behalf of <br />Client Client will be billed for services by Patriot's subcontractors at the greater o€tile rates fisted In the Patriot Fee Schedule of Services <br />or the cost of the subcon tractor'a services plus an adre fnistra five Charge offwonty Percent (20%) of the Cost of these services. <br />Subcontractors'servlces will be listed on the Patriot Daily Work Report, Client agreesnot to can tact PCtdot's subcontractors, directly <br />or Indirectly (Including through agents), to attempt to secure the subcontractor's services for work to complete the Services, except <br />through Patriot, or to seek to Induce the Succumb'aotors to violate the terms of their agreements with Patriot, <br />9. Storage Bladders are designed to provide temporary storage and onetime usage. Client will be notified prior to deployment of <br />bladder and Informed of replacement value. If deployed, client be bitted for replacement at Patriot's cost plus twenty percent (20%) and <br />will be responsible for the transportation & disposal of the existing bladder as required <br />10. Energy Surchage fee of9.7% along with Environmental and Insurance surcharge fee of2.9%Shall be applied to all invoices and <br />subject to both labor and materials. <br />January 1, 2018 Page 4 of 4 EQUIPMENT <br />