Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 17-6885: EDINGER PROTECTED BIKE <br />LANES FROM SANTA ANA RIVER TO BRISTOL STREET [ATPL-5063(172)] <br />Construction Contract <br />$ <br />1,663,906 <br />Contract Administration <br />$ <br />120,377 <br />Inspection and Testing <br />$ <br />141,000 <br />Contingencies <br />$ <br />88,677 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />2,013,960 <br />EXHIBIT 5 <br />20A-41 <br />