My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/28/2019 <br />beta.SAM.gov <br />AREA 2: LOS ANGELES (Remainder), ORANGE, RIVERSIDE & SAN <br />BERNARDINO COUNTIES <br />Work on general sheet metal and heating and air conditioning on <br />single family dwellings, multiple family dwellings, track homes <br />and apartment buildings individually conditioned by separate <br />and independent units or systems <br />Rates Fringes <br />SHEET METAL WORKER <br />AREA I... . ... .......... $ 26.57 10.41 <br />AREA 2...................... 1 29.54 19.09 <br />SHEE0206-003 07/01/2017 <br />IMPERIAL <br />Rates Fringes <br />Sheet Metal (TECHNICIAN),. ....... $ 27.70 8.43 <br />SHEET METAL WORKER ....... ........ $ 36.88 26.52 <br />SHEET METAL TECHNICIAN - SCOPE: <br />a. Existing residential buildings, both single and <br />multi -family, where each unit is heated and/or cooled by a <br />separate system b. New single family residential buildings <br />including tracts. c. New multi -family residential <br />buildings, not exceeding five stories of living space in <br />height, provided each unit is heated or cooled by a <br />separate system. Hotels and motels are excluded. d. LIGHT <br />COMMERCIAL WORK: Any sheet metal, heating and air <br />conditioning work performed on a project where the total <br />construction cost, excluding land, is under $1,000,006 e. <br />TENANT IMPROVEMENT WORK: Any work necessary to finish <br />interior spaces to conform to the occupants of commercial <br />buildings, after completion of the building shell <br />------------------------------------------- <br />SHEE0273-001 08/01/2018 <br />SAN LUIS OBISPO, SANTA BARBARA AND VENTURA <br />Rates Fringes 23A-103 <br />blips: flibetan sa TEL g ovIwa g e-d eterm inationlCA2019001 7/4/document <br />43149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.