Laserfiche WebLink
8/28/2019 beta.SAM.gov <br />Riverside 6 San Bernardino <br />Counties ....................$ 39.07 14.57 <br />Ventura County ..............$ 39.22 16.93 <br />*The wage scale for prevailing wage projects performed in <br />Blythe, China lake, Death Valley, Fort Irwin, Twenty -Nine <br />Palms, Needles and 1-15 corridor (Barstow to the Nevada <br />State Line) will be Three Dollars ($3.00) above the <br />standard San Bernardino/Riverside County hourly wage rate <br />BRCA0004-004 11/91/2017 <br />IMPERIAL <br />Rates Fringes <br />BRICKLAYER; MARBLE SETTER .... <br />...-$ 47.36 <br />16.79 <br />* BRCA0004-009 05/01/2018 <br />SAN LUIS OBISPO AND SANTA BARBARA COUNTIES <br />Rates Fringes <br />BRICKLAYER; MARBLE SETTER ........ $ 40.34 15.10 <br />*The wage scale for prevailing wage projects performed in <br />Blythe, China lake, ❑eath Valley, Fort Irwin, Twenty -Nine <br />Palms, Needles and 1-15 corridor (Barstow to the Nevada <br />State Line) will be Three Dollars ($3.00) above the <br />standard San Bernardino/Riverside County hourly wage rate <br />---------------------------------------------------------------- <br />BRCA0018-001 07/01/2017 <br />Rates Fringes <br />MARBLE FINISHER... ........ ...... <br />$ 30.93 <br />12.95 <br />TILE FINISHER__ .............. <br />$ 25.98 <br />11.23 <br />------------- <br />ORCA0019-002 07/01/2017 <br />SAN LUIS 09ISPO AND SANTA BARBARA <br />Rates Fringes 23A-63 <br />https://beta.sam.gov/wage-determination/CA20190017/4/document 3/49 <br />