My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/28/2019 <br />beta.SAM.gov <br />China Lake Naval Test Station, Chocolate Mountains Naval <br />Reserve-Niland, <br />Edwards AFB, Fort Irwin Military Station, Fort Irwin Training <br />Center -Goldstone, San Clemente Island, San Nicholas Island, <br />Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine <br />Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg Ana <br />$4.00 additional per hour at the following locations; <br />Army Defense Language Institute - Monterey, Fallon Air Base, <br />Naval Post Graduate School - Monterey, Yonne Marine Corps <br />Logistics Center <br />$2.00 additional per hour at the following locations: <br />Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock <br />LAB00220-003 07/01/2018 <br />Residential, 4 Stories <br />SAN LUIS OBISPO AND SANTA BARBARA COUNTIES <br />Rates Fringes <br />LABORER <br />GROUP 1..................... <br />1 34.24 <br />19.07 <br />GROUP 2.... ........ <br />......... $ 34.79 <br />19.07 <br />GROUP 3.....................$ <br />35.34 <br />19.07 <br />GROUP 4..... <br />....... ..... .... $ 36.89 <br />19.07 <br />GROUP 5.................. <br />_ $ 37.24 <br />19.07 <br />LABORER CLASSIFICATIONS <br />GROUP 1: Cleaning and handling of panel forms; Concrete <br />screeding for rough strike -off; Concrete, water curing; <br />Demolition laborer, the cleaning of brick if performed by a <br />worker performing any other phase of demolition work, and <br />the cleaning of lumber; Fire watcher, limber, brush loader, <br />piler and debris handler; Flag person; Gas, oil and/or <br />water pipeline laborer; Laborer, asphalt -rubber material <br />loader; Laborer, general or construction; Laborer, general <br />clean-up; Laborer, landscaping; Laborer, jetting; Laborer, <br />23A-80 <br />https://beta.sam.govlwage-determination/CA2019001714 /document 20/49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.