My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/28/2019 <br />bela.SAM.gov <br />VENTURA COUNTY <br />Rates Fringes <br />Brick Tender— ...... ........... % 32.26 18.40 <br />LABOO652-002 07/01/2018 <br />Residential, 4 Stories <br />ORANGE COUNTY <br />Rates Fringes <br />LABORER <br />GROUP 1.....................$ <br />34.24 <br />19.07 <br />GROUP2.....................$ <br />34.79 <br />19.07 <br />GROUP 3.....................8 <br />35.34 <br />19.07 <br />GROUP 4................/.....$ <br />36.89 <br />19.07 <br />GROUP 5.... ................. <br />$ <br />37.24 <br />19.07 <br />LABORER CLASSIFICATIONS <br />GROUP l: Cleaning and handling of panel forms; Concrete <br />screening for rough strike -off; Concrete, water curing; <br />Demolition laborer, the cleaning of brick if performed by a <br />worker performing any other phase of demolition work, and <br />the cleaning of lumber; Fire watcher, limber, brush loader, <br />piler and debris handler; Flag person; Gas, oil and/or <br />water pipeline laborer; Laborer, asphalt -rubber material <br />loader; Laborer, general or construction; Laborer, general <br />clean-up; Laborer, landscaping; Laborer, jetting; Laborer, <br />temporary water and air lines; Material hose operator <br />(walls, slabs, floors and decks); Plugging, filling of shee <br />bolt holes; Dry packing of concrete and patching; post hole <br />digger (manual);Railroad maintenance, repair track person <br />and road beds;Streetcar and railroad construction track <br />laborers; Rigging andsigoaling; Scaler; Slip form raiser; <br />Slurry seal crew (mixer operator, applicator operator, <br />squeegee person, shuttle person, top person), filling of <br />cracks by any method on any surface; Tar and mortar; Tool <br />crib or tool house laborer; Traffic control by any method; <br />Window cleaner; Wire mesh pulling - all concrete pouring <br />operations <br />23A-89 <br />https://beta.sam.gov/wage-determination/CA20190017/4/document 29/49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.