My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
812812019 <br />beta.SAM.gov <br />LABORER <br />GROUP 1.... .................$ 34.24 19.07 <br />GROUP 2.......... ........... 1 34.79 19.07 <br />GROUP 3......................$ 35.34 19.07 <br />GROUP 4......................$ 36.89 19.07 <br />GROUP 5.....................$ 37.24 19.07 <br />GROUP .......................$ 35.84 18,24 <br />LABORER CLASSIFICATIONS <br />GROUP 1: Cleaning and handling of panel forms; Concrete <br />screening for rough strike -off; Concrete, water curing; <br />Demolition laborer, the cleaning of brid< if performed by a <br />worker performing any other phase of demolition work, and <br />the cleaning of lumber; Fire watcher, limber, brush loader, <br />piler and debris handler; Flag person; Gas, oil and/or <br />water pipeline laborer; Laborer, asphalt -rubber material <br />loader; Laborer, general or construction; Laborer, general <br />clean-up; Laborer, landscaping; Laborer, jetting; Laborer, <br />temporary water and air lines; Material hose operator, <br />(walls, slabs, floors and decks); Plugging, filling of shee <br />bolt holes; Dry packing of concrete and patching; post hole <br />digger (manual);Railroad maintenance, repair track person <br />and road beds;Streetcar and railroad construction track <br />laborers; Rigging andsignaling; Scaler; Slip form raiser; <br />Slurry seal crew (mixer operator, applicator operator, <br />squeegee person, shuttle person) top person), filling of <br />cracks by any method an any surface; Tar and mortar; Tool <br />crib or tool house laborer; Traffic control by any method; <br />Window cleaner; Wire mesh pulling - all concrete pouring <br />operations <br />GROUP 2: Asbestos abatement; Asphalt shoveler; Cement dumper <br />(on 1 yd. or larger mixer and handling bullk cement); <br />Cesspool digger and installer; Chucktender; Chute handler, <br />pouring concrete, the handling of the chute from readymix <br />trucks, such as walls, slabs, decks, floors, foundation, <br />footings, curb, gutters and sidewalks; Concrete curer, <br />impervious membrane and form oiler; Cutting torch operator <br />(demolition); Fine grader, highways and street paving, <br />airport, runways and similar type heavy construction; Gas, <br />oil and/or water pipeline wrapper - pot tender and form <br />person; Guinea chaser; Headerboard person - asphalt <br />installation of all asphalt overlay fabric and materials <br />used for reinforcing asphalt; Laborer, packing rod steel 2 3A-° 2 <br />https:e/beta.sam.gov/wage-determination/CA20190017/4/document 32/49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.