My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/28/2019 <br />conveying of any substance or element, whether water, <br />sewage, solid gas, air, or other product whatsoever and <br />without regard to the nature of material from which the <br />tubular material is fabricated; No -joint pipe and stripping <br />of same; Prefabricated manhole installer; Sandblaster <br />(nozzle person), water blasting,Porta Shot -Blast; Traffic <br />lane closure, Certified. <br />GROUP 5: Blaster powder, all work of loading holes, placing <br />and blasting of all powder and explosives of whatever type, <br />regardless of method used for such loading and placing; <br />Driller: All power drills, excluding jackhammer, whether <br />core, diamond, wagon, track, multiple unit, and any and all <br />types of mechanical drills without regard to the form of <br />motive power; Toxic waste removal; Boring system electronic <br />tracking locator <br />--------------------------- <br />LAB00783-006 07/01/2018 <br />SAN BERNARDINO COUNTY <br />Rates Fringes <br />Brick Tender .....................$ <br />--------------------------------------------------------- <br />32.26 <br />18.40 <br />LAD01184-001 07/01/2018 <br />Rates Fringes <br />Laborers: (HORIZONTAL <br />DIRECTIONAL DRILLING) <br />(1) Drilling Crew Laborer...$ <br />35.70 <br />14.03 <br />(2) Vehicle Operator/Hauler.$ <br />35.87 <br />14.03 <br />(3) Horizontal Directional <br />Drill Operator ..............$ <br />37.72 <br />14.03 <br />(4) Electronic Tracking <br />Locatof................. ....$ <br />39.72 <br />14.03 <br />Laborers: (STRIPING/SLURRY <br />SEAL) <br />GROUP 1.....................$ <br />35.86 <br />16.21 <br />GROUP 2........... .......... <br />$ 37.16 <br />16.21 <br />GROUP 3.....................$ <br />39.17 <br />16.21 <br />GROUP 4.....................$ <br />40.91 <br />16.21 <br />beta.SAM.gov <br />LABORERS - STRIPING CLASSIFICATIONS <br />23A-94 <br />https:11beta, saNo. govlwage-deterun ination/CA20190017/4ldocument 34)49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.