My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALLIANCE ELECTRICAL SYSTEMS, INC.
Clerk
>
Contracts / Agreements
>
A
>
ALLIANCE ELECTRICAL SYSTEMS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 9:54:11 AM
Creation date
10/17/2019 3:02:18 PM
Metadata
Fields
Template:
Contracts
Company Name
ALLIANCE ELECTRICAL SYSTEMS, INC.
Contract #
A-2019-182
Agency
Parks, Recreation, & Community Services
Council Approval Date
10/1/2019
Expiration Date
9/30/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Energy Network <br />Appendix A: Lighting Inventory <br />Site Desoription <br />Extent, Llghgng sytlam <br />Propowd Lighting 5yotoln <br />TWO 24 <br />Regulrem..W. <br />ITEM# <br />Lcomgon orator Roam#Rcom <br />Type <br />solution <br />Fxt Cade <br />Fixture 0exoripflon <br />Ex, Fx4 <br />Ex.kWl <br />" Tota <br />Propamd Flawre Oasrlptlon' <br />Prop' <br />FIxL <br />Occupancy <br />Qatla <br />Qly�" <br />Pat <br />kW <br />Sonxomi <br />I <br />Ball Fleld <br />Exledor <br />LT65839 <br />HPS1000PM <br />1000W HPS Spoda Ughling - Pole Wart <br />67 <br />1.10 <br />Ephesus 550W sestu Lighting <br />8] <br />N <br />0.550.XL646BIX ^"' <br />2 <br />Psvk weIkw.ys <br />Exltltlor <br />LLi1322 <br />MH250PM <br />2M WWI Halt. Pole Manor <br />IB <br />0,30 <br />Eye LI9MIng 56W LEOIOC Relrofil <br />16 <br />N <br />_ <br />LEs.SP]AO HWaXgttUNV-%XXXX) <br />a <br />Building Exledor <br />Exietlor <br />LL1fl132 <br />MYIt]6WM <br />175W Metal Halide Well Mounted Floods <br />23 <br />0.22 <br />R B 52W Flood Light t MS <br />23 <br />y <br />FFLE062 + SM5600 <br />"The Contractor is responsible for finalizing fixture model numbers <br />""The Contractor Is responsible for confirming all fixture counts, pre and post case. <br />-*-The Contractor is responsible for confirming Title 24 compliance for all applications, Including Installation of Occupancy Sensors where applicable, <br />"-'The Contractor Is responsible for the setup, calibration, and positioning of the Ephesus Lighting Fixtures <br />"'*""The Contractor Is responsible for determining which optic to use on the Ephesus Lighting Fixtures <br />ID a <br />Puhl'c ag6xci6, taN p]trl,mueep mpy <br />
The URL can be used to link to this page
Your browser does not support the video tag.