Laserfiche WebLink
The Energy Network <br />Appendix A: Lighting Inventory <br />Site Desoription <br />Extent, Llghgng sytlam <br />Propowd Lighting 5yotoln <br />TWO 24 <br />Regulrem..W. <br />ITEM# <br />Lcomgon orator Roam#Rcom <br />Type <br />solution <br />Fxt Cade <br />Fixture 0exoripflon <br />Ex, Fx4 <br />Ex.kWl <br />" Tota <br />Propamd Flawre Oasrlptlon' <br />Prop' <br />FIxL <br />Occupancy <br />Qatla <br />Qly�" <br />Pat <br />kW <br />Sonxomi <br />I <br />Ball Fleld <br />Exledor <br />LT65839 <br />HPS1000PM <br />1000W HPS Spoda Ughling - Pole Wart <br />67 <br />1.10 <br />Ephesus 550W sestu Lighting <br />8] <br />N <br />0.550.XL646BIX ^"' <br />2 <br />Psvk weIkw.ys <br />Exltltlor <br />LLi1322 <br />MH250PM <br />2M WWI Halt. Pole Manor <br />IB <br />0,30 <br />Eye LI9MIng 56W LEOIOC Relrofil <br />16 <br />N <br />_ <br />LEs.SP]AO HWaXgttUNV-%XXXX) <br />a <br />Building Exledor <br />Exietlor <br />LL1fl132 <br />MYIt]6WM <br />175W Metal Halide Well Mounted Floods <br />23 <br />0.22 <br />R B 52W Flood Light t MS <br />23 <br />y <br />FFLE062 + SM5600 <br />"The Contractor is responsible for finalizing fixture model numbers <br />""The Contractor Is responsible for confirming all fixture counts, pre and post case. <br />-*-The Contractor is responsible for confirming Title 24 compliance for all applications, Including Installation of Occupancy Sensors where applicable, <br />"-'The Contractor Is responsible for the setup, calibration, and positioning of the Ephesus Lighting Fixtures <br />"'*""The Contractor Is responsible for determining which optic to use on the Ephesus Lighting Fixtures <br />ID a <br />Puhl'c ag6xci6, taN p]trl,mueep mpy <br />