Laserfiche WebLink
*:/ : 11-1 h WA <br />parcoufse with exercise stations is also provided with low intensity security lighting. The park landscaping has <br />been designed with drought tolerant planting, dfip/water efficient irrigation, and a dry artificial streambed. No <br />vehicle parking is provided. <br />1.4.2 Project Phasing <br />Construction of the 6th Street Site started in Spring 2019 and the construction of the Raitt Street Site is <br />tentatively scheduled to start in Summer 2019. The construction is anticipated to take approximately two to <br />three months upon approval of necessary permits. <br />1.5 EXISTING ZONING AND GENERAL PLAN <br />CEC Site: Centennial Park/Santa Ana College is designated as OS (Open Space) by the City of Santa Ana <br />General Plan and zone O (Open Space). <br />6'h Street Site: This site is designated as UN (Urban Neighborhood) by the City of Santa Ana General Plan <br />aid zoned O (Open Space). <br />Raitt Street Site: This site is designated as OS (Open Space) by the City of Santa Ana General Plan and <br />zoned O (Open Space). <br />McFadden Site/Pacific Electric Park: Pacific Electric Park is designated as OS (Open Space) by the City <br />of Santa Ana General Plan and zone O (Open Space). <br />1.6 CITYACTION REQUESTED <br />■ Approve the project <br />■ Adopt Mitigated Negative Declaration <br />■ Adopt Mitigation Monitoring and Repofting Program <br />75C-45 <br />