Laserfiche WebLink
*:/ : 11-1 h WA <br />Less Than <br />Significant <br />Potentially <br />With <br />Less Than <br />Significant <br />Mitigation <br />Significant <br />No <br />Issues <br />Impact <br />Incorporated <br />Impact <br />Impact <br />c) Emit hazardous emissions or handle hazardous or acutely <br />hazardous materials, substances, or waste within one -quarter <br />X <br />mile of an existing or proposed school? <br />d) Be located on a site which is included on a list of hazardous <br />materials sites compiled pursuant to Government Cade <br />X <br />§ 65962.5 and, as a result, would it create a significant hazard <br />to the public or the environment? <br />e) For a project located within an airport land use plan or, where <br />such a plan has not been adopted, within two miles of a public <br />airport or public use airport, would the project result in a safety <br />X <br />hazard or excessive noise for people residing or working in the <br />project area? <br />f) Impair implementation of or physically interfere with an <br />adopted emergency response plan or emergency evacuation <br />X <br />plan? <br />g) Expose people or structures, either directly or indirectly, to a <br />X <br />significant risk of loss, injury or death involving wildland fires? <br />X. HYDROLOGY AND WATER QUALITY. Would the <br />project: <br />a) Violate any water quality standards or waste discharge <br />requirements or otherwise substantially degrade surface or <br />X <br />ground water quality? <br />b) Substantially decrease groundwater supplies or interfere <br />substantially with groundwater recharge such that the project <br />X <br />may impede sustainable groundwater management of the <br />basin? <br />c) Substantially alter the existing drainage pattern of the site or <br />area, including through the alteration of the course of a stream <br />or river or through the addition of impervious surfaces, in a <br />manner which would: <br />i) result in a substantial erosion or siltation on -or off -site, <br />X <br />ii) substantially increase the rate or amount of surface <br />runoff in a manner which would result in flooding on- or <br />X <br />offsite, <br />iii) create or contribute runoff water which would exceed the <br />capacity of existing or planned stonnwaterdrainage <br />X <br />systems or provide substantial additional sources of <br />polluted runoff, or <br />iv) impede or redirect flood flows? <br />X <br />d) In flood hazard, tsunami, or seiche zones, risk release of <br />X <br />pollutants due to project inundation? <br />e) Conflict with or obstruct implementation of a water quality <br />X <br />control plan or sustainable groundwater management plan? <br />XI. LAND USE AND PLANNING. Would the project: <br />a) Physically divide an established community? <br />X <br />b) Cause a significant environmental impact due to a conflict with <br />any land use plan, policy, or regulation adopted for the <br />X <br />purpose of avoiding or mitigating an environmental effect? <br />75C-58 <br />