My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-090 - Adopting the Mitigated Negative Declaration
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-090 - Adopting the Mitigated Negative Declaration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 4:57:37 PM
Creation date
10/23/2019 4:49:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-090
Date
10/15/2019
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTENNIAL PARKISANTA ANA COLLEGE PARK REPLACEMENT PROJECT IN IT EXHI L STUDY <br />T 2 <br />CITY OF SANTA ANA <br />TOP OF <br />2 1/2" WIDE x 8" HIGH MIN <br />HANDHOLE WITH GROUNDING <br />LUGS, GASKETED COVER <br />AND TAMPERPROOF SCREWS <br />14'-1" <br />ANCHOR BOLTS BY POLE <br />MANUFACTURER, PROVIDE <br />2 NUTS FOR EACH BOLT <br />FOR LEVELING <br />APPLY ANTI —GRAFFITI <br />COATING 24" <br />GRADE u' <br />f'3 HORIZONTAL TIES 1 <br />012 � O.C. BOTH WAYS 5'_O <br />a <br />Design West Engineering, 2018 <br />Figure 11 - Nighttime Light Poles <br />-LED FIXTURE <br />700MA, 16,000 LUMENS, DARK BRONZE HOUSING, EPA = 1.2SF <br />LEO TEKI AR13-18M-MV-MW-3-4-DB-700-RPA (155W) <br />"OPTICAL DISTRIBUTION TYPE: <br />T3, T4, 75R, T5SW PER PLAN <br />TAPERED 6" ROUND 14'-1" BROWN AGGREGATE <br />CONCRETE POLE, AMERON OR EQUAL BY STRESS CRETE <br />COLOR TO MATCH FIXTURE, WITH ANTI -GRAFFITI COATING <br />AMERON POLE) MBR-4.3-14.1' ON 18" BASE <br />COLOR# BZ3 BRONZE WITH EXPOSED FINISH AND <br />AMERISHIELD COATING <br />GROUT CAP PER SPECIFICATIONS <br />TO COVER NUTS, APPLY ANTI -GRAFFITI COATING <br />2" CHAMFER ALL AROUND <br />PROVIDE 3 ROWS OF HORIZONTAL <br />$3 TIES AT 3"O.C. IN TOP 9" OF FOOTING <br />� 24"6 <br />} i <br />1` 24" MIN. E <br />L PROVIDE 1 PULL <br />BOX PER FIXTURE <br />EXISTING CONDUIT AND WIRE, OR NEW <br />WHERE SHOWN ON PLANS <br />3/4"C-2#10,1110G MINIMUM <br />14"C-2#12,1112G FROM PB TO FIXTURE <br />.ESS NOTED OTHERWISE) ON PLAN, <br />!4" RADIUS SWEEPS BETWEEN PB 9 FOUNDATION. <br />5133883 (SCHED 40 PVC) <br />VERTICAL BARS W/ <br />DARD 90' HOOK AT TOP <br />0 4 <br />Scale (Feet) <br />75C-64 Prn`ew°r ff <br />
The URL can be used to link to this page
Your browser does not support the video tag.