Laserfiche WebLink
MITIGATION MONITORING AND REPORTING PROGRAM <br />FOR <br />CENTENNIAL. PARK/SANTA ANA COLLEGE PARK REPLACEMENT PROJECT <br />CEQA Action: Mitigated Negative Declaration (State Clearinghouse # 2019089067) <br />Project Description —The proposed project involves the construction and operation of replacement parklands in lieu of 2.6-acre, CEC Site <br />leased to RSCCD in Centennial Park. The replacement parklands include three park sites, the 6th Street Site, Rain Street Site, and McFadden <br />Site/Pacific Electric Park.'Igre city constructed Pacific Electric Park on the McFadden Site, and the Pacific Electric Park opened in January <br />2018. Therefore, the proposed project involves construction and operation of nvo replacement parks on the 6th Street Site and the Rain Street <br />Site in the City of Santa Ana. <br />and <br />After installation of the <br />AE-1 The City of Santa Ana shall perform field light measurements after the lighting pole installation to <br />City of Santa Ana <br />City of Sama Ana <br />light poles. <br />demonstrate that actual spill light levels near the adjacent esidential units to the west and south <br />are a close match to the levels indicated in the light levels plan shown in Figure 12, 6th Street <br />Site Photometric Plan 1, and Figure 13, 6th Street Site Photometric Plan 2. The light levels shall <br />not exceed 0.8 foot-candle at the habitable residential structure, and luminaire(s) affixed on the <br />pole shall be shielded and adjusted so that no direct upward beam is permitted. <br />Prior to grading and during <br />CUL-1 During initial ground -disturbing activities that extend beyond artificial fill materials, an <br />City of Santa Ana <br />City of Santa Ana <br />grading activities as specified <br />archaeological spot monitoring shall be provided. Should archaeological resources, including <br />in Mitigation Measure CUL-11 <br />annual resources, be found work within 25 feel of the find must halt and an archaeologist morning <br />the Secretary of the Interiofs Professional qualifications Standards its archaeology must be <br />contacted, and the qualified monitor shall first determine whether the resource is a'unique <br />archaeological resource pursuant to Section 21083.2(g) of the California Public Resources <br />Cade or a "historical resource" pursuant to Section 15064.5(a) of the Stale CEQA Guidelines <br />(14 California Code of Regulations [CCRD, or "tribal cultural resources" pursuant to Public <br />Resources Cade Section 21074. Once the determination is made pursuant to CEQA Guidelines <br />Section 21083.2, the appropriate actions shall be taken in appropriate sectors of the <br />regulations (e.g., 14 CCR §15126.4) to ensure that impacts are reduced to a less than <br />significant level. <br />And if prehistoric human remains are discovered, the responsible county coroner shall notify the <br />Native American Heritage Commission, which will determine and notify a most likely descendent <br />MLD . The MLD shall complete the inspection of the area of potential effects within 48 hours of <br />75C-10 <br />