My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 5:23:36 PM
Creation date
10/23/2019 5:19:58 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING, INC.
Contract #
A-2019-171
Agency
PUBLIC WORKS
Council Approval Date
10/1/2019
Expiration Date
9/30/2022
Insurance Exp Date
6/25/2020
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORT{ <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />CONSTRUCTION ENGINEERING SERVICES FOR <br />SAN LORENZO SEWAGE LIFT STATION <br />RFP NO.: 17-115 <br />Introduction and Background: <br />The City desires to engage a professional consultant to perform construction engineering <br />services for the San Lorenzo Sewage Lift Station project. The consultant shall provide three <br />individuals to act as Project Manager (PM), Inspector, and a Contract Administrator (CA), and <br />serve as an extension of City staff to assist in the overall delivery of this project, including pre - <br />construction tasks, managing construction and ensuring that the work is completed in <br />accordance with the contract documents, and project closeout and warranty phase. The <br />consultant team will report directly to the City's Construction Manager or his authorized <br />representative, City staff may assist in managing construction and will oversee the work of the <br />Project Manager, Inspector, and Contract Administrator. <br />The estimated constriction cost for the San Lorenzo Sewage Lift Station project is $6 million. <br />The City anticipates advertising construction bids in the early fall 2018, and starting <br />construction by late 2018. Total construction duration for the project is anticipated to be 14 <br />months. <br />Description of Work: <br />The required services by the Project Manager, the Inspector and the Contract Administrator may <br />include the following: <br />The PM shall be a registered engineer in the State of California and shall <br />represent the City Construction Manager in the field. The CM shall possess a <br />minimum of (5) years' experience in sewer lift station construction management. <br />The Inspector and tie Contracts Administrator should have relevant experience <br />in sewer lift station construction management and certifications that affirm the <br />experience. <br />2. Prior to the start of the project, the PM shall be responsiblo for conducting a bid <br />analysis to determine who the lowest responsible bidder for the project will be. <br />Shall obtain certificates of insurance, performance bond and "New Vendor <br />Packet" requirements have been satisfied. This includes verifying that all sub- <br />contractors have a valid City Business License. Once determined, a staff report <br />will need to be generated to recommend the award of a Construction Contract. <br />City of Santa Ana RFP 18-049 <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.