My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC. (5)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARNAZ ENGINEERING CONTRACTORS, INC. (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2019 1:41:16 PM
Creation date
10/28/2019 1:40:00 PM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
17-2675
Agency
Public Works
Council Approval Date
7/16/2019
Document Relationships
23B - PROJ - CIVIC CENTER STORMWATER LIFT STATIONS
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\07/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM NO. I <br />PROPOSAL <br />PROJECrNO.: 17-2675 EXHIBIT A <br />CIVIC CI NTEIt STORMWATER LIFT STATION IUMVATION <br />j TOTAL BAST~ BID 1 5 1,022,000,00 t <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to onward The Base Bid. and anv. all. or none of the add -alternate bid items (if ally). <br />The quantity for this bill item is shown for bid comparison only. This bid item shall not be <br />subject to the " 25%i' limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual gaantity used, and the Agency reserves the <br />right to increase or decrease the quantity, of this item accordingly. <br />.l This bid item is considered a Specialty Item per Section 2-3 2 of the Standard Specifications. <br />TIME FDAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above. within one hundred and eighty ( I T workine days after the connnnencement date stated hn <br />the Notice to Procced. <br />The liquidated damages amount, in lieu orthe amount specified in Subsection 6-9 of the Standard <br />Specifications. shall be S 1.250 per calendar day. <br />Name of Firm Arnaz Engineering Contractors. Inc. <br />Signaua•e orBIDDE.R <br />Title President <br />(lfan individual, so state. If a fnm or co -partnership, state the ITrm name and give the names of <br />all individual co-partners composing the form. If corporation, state legal mine of corporation, <br />and names or President. Secretary. Treasurer and Manager. thereof:) <br />P-2 o f P-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.