Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NOS.: 18-7526 & 18-7527 RESIDENTIAL STREET REPAIR PROGRAM <br />PROJECT NO. 18-6910 ALLEY IMPROVEMENT FY 17/18 <br />ID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: EBS General Engineering, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />430 <br />CY <br />$ <br />$ <br />135 <br />58,050 <br />2 <br />Asphalt Concrete (AC) Pavement* <br />40 <br />TN <br />$ <br />$ <br />250 <br />10,000 <br />3 <br />Aggregate Base* <br />100 <br />TN <br />$ <br />$ <br />45 <br />4500 <br />4 <br />Removal of 6" PCC at Various Locations* <br />1,120 <br />CY <br />$ <br />$ <br />135 <br />151,200 <br />5 <br />Construct 6" PCC Pavement with (3-day) <br />1,120 <br />CY <br />$ 230 <br />$ 257,600 <br />Cure including Dowels* <br />6 <br />Crack Seal with Deere Super Gray* <br />30,000 <br />LF <br />$ <br />$ <br />4.25 <br />127,500 <br />7 <br />Construct PCC Sidewalk (14")* <br />6,100 <br />SF <br />$ <br />$ <br />5.00 <br />30,500 <br />8 <br />Construct PCC Driveway Approach <br />900 <br />SF <br />$ 7.00 <br />$ 6300 <br />(T=6")* <br />9 <br />Construct PCC Curb Ramp <br />6,000 <br />SF <br />$ <br />$ <br />11 <br />66,000 <br />10 <br />Construct PCC Curb and Gutter (A-2-6)* <br />100 <br />LF <br />$ <br />$ <br />35 <br />3500 <br />11 <br />Construct PCC Curb and Gutter (B-1)* <br />400 <br />LF <br />$ <br />$ <br />35 <br />14,000 <br />12 <br />Construct PCC Alley Apron (T=8") <br />400 <br />SF <br />$ <br />$ <br />10 <br />4000 <br />13 <br />Construct PCC Alley (T=8") with (3-Day) <br />160 <br />CY <br />$ 330 <br />$ 52,800 <br />Cure <br />14 <br />Construct PCC Cross -Gutter (Local Street) <br />2,200 <br />SF <br />$ <br />$ <br />9.00 <br />19,800 <br />P-12 of P-28 <br />