My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 10:49:52 AM
Creation date
10/28/2019 2:34:37 PM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC
Contract #
18-7526, 18-7527
Agency
Public Works
Council Approval Date
5/21/2019
Insurance Exp Date
9/28/2019
Document Relationships
23A - RESIDENTIAL/ALLEY IMPROV PROJ
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\05/21/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Of Santa Ana <br />Page 2 <br />Residential Street Repair Program and Alley Improvement FY 17118 (1$-7526,18-7627 & 18.6910), bidding on February <br />Printed 03/0112019 <br />Bid Results <br />EXHIBIT A <br />Type Item Code <br />UOM <br />city <br />Unit Price <br />Line Total Comment <br />3 Aggregate Base <br />TN <br />100 <br />$45.00 <br />$4,500.00 <br />4 Removal of 6" PCC at Various Locations <br />CY <br />1120 <br />$136.00 <br />$151,200A0 <br />5 Construct 8" PCC Pavement with (3-day) Cure <br />Including Dowels <br />CY <br />1120 <br />$230,00 <br />$257,600.00 <br />6 Crack Seal with Deere Super Gray <br />LF <br />30000 <br />$4.26 <br />$127,500.00 <br />7 Construct PCC Sidewalk (T=4") <br />SF <br />0100 <br />$5.00 <br />$30.500.00 <br />8 Construct PCC Driveway Approach (T=6")* <br />SF <br />900 <br />$7.00 <br />$6,300.00 <br />9 Construct PCC Curb Ramp <br />SF <br />$000 <br />$11.00 <br />$56,000.00 <br />10 Construct PCC Curb and Gutter (A-2-6) <br />.. .... ..... <br />LF <br />100 <br />$35.00 <br />$3.600.00 <br />19 Construct PCC Curb and Gutter (BA) <br />LF <br />400 <br />$35.00 <br />$14,000.00 <br />12 Construct PCC Alley Apron(T=8") <br />SF <br />400 <br />$10.00 <br />$4,000.00 <br />13 Construct PCC Alley (T=8") with (3-Day) Cure <br />CY <br />100 <br />$330.00 <br />$52,000.00 <br />14 <br />Construct PCC Cross -Gutter (Local Street) <br />SF <br />2200 <br />$9.00 <br />$19,600.00 <br />15 <br />Grind PCC <br />LF <br />300 <br />$30.00 <br />$9,000.00 <br />16 <br />Root Shave <br />EA <br />16 <br />$400.00 <br />$6,400.00 <br />17 <br />Adjust Sewer Manhole Frame and Cover to Finished Grade <br />EA <br />15 <br />$500.00 <br />$7,600.00 <br />1a <br />Furnish and Install Water Valve Frame and Cover to Grade <br />EA <br />15 <br />$650.00 <br />$9,760.00 <br />Planetalds, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.