Laserfiche WebLink
City of Santa Ana <br />Page 2 <br />Willard Neighborhood Sewer Main Improvements (16-6466), bidding on June 5, 2019 2:00 PM (Pacific) <br />Printed 07/%2019 <br />Bid Results <br />EXHIBIT A <br />Type <br />Item Code UOM QtY Unit Price <br />Line Total Comment <br />3 <br />Construct New P.C.G. Sewer Manhole <br />EA 11 $4,609.07 <br />$49,608.67 <br />4 <br />Remove Existing Sewer Manhole <br />EA 11 $1,316.96 <br />$14,480.56 <br />5 <br />Construct 4" or 6" PVC Sewer Lateral and Cleanout from Sewer Mein to Properly Line per C.S.A Sid, <br />1204 (Open Trench) <br />EA 69 $2,631.82 <br />$181,596.66 <br />6 <br />Construct Driveway Approach <br />SF 2000 $13.80 <br />$27,600.00 <br />7 <br />Sewer Flow Level Monitoring and Alarming Device <br />EA 2 $6,141.00 <br />$12,262.00 <br />8 <br />CCTV Inspection of Newly Constructed PVC Sewer Main and Newly Constructed PVC Sewer Laterals (Open trenoh/Pipe Burst) <br />LS 1 $8,809.46 <br />$8,600.46 <br />9 <br />Traffic Control <br />LS 1 $29,081.88 <br />$29,081.88 <br />10 <br />imported Backflll for Sewer Main Construction (Trench zone baokflll only)** <br />CY 1000 $76.18 <br />$76,180.00 <br />11 <br />Signing and Striping <br />LS 1 $3,428.15 <br />$3,428.15 <br />12 <br />Project Advertising Sign <br />EA 1 $4.374.97 <br />$4,374.97 <br />1$ <br />As -Built <br />L8 1 $25,000.00 <br />$25,000.00 <br />14 <br />Labor Agreement Oversight <br />LS 1 $10,000.00 <br />$10.000.00 <br />Subtotal <br />$805,820.03 <br />Asterisk Notes (per 134 of P-16 of Specifications) -NOT part of Total Bid Calculation <br />15 <br />* = MoblllzatlonlDemobllizatlon bid item Is limited to a maximum of 5%" of the Total Bid <br />as 0 0 <br />0 <br />16 <br />** = The quantity for this bid Item Is shown for bid comparison only. This bid Item shall not he subject to the 25% limit as stated in Section 3-2 <br />of the Speclflcaticns... <br />as 0 0 <br />0 <br />Subtotal <br />0 <br />Total <br />$606,829.03 <br />PlanetBids, Inc. <br />