My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (20)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2019 5:06:36 PM
Creation date
10/28/2019 5:05:15 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
5/7/2019
Document Relationships
23A - PROJ SLURRY SEAL 1ST & RAITT
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\05/07/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECTNOS.: 19-6921 AND 19-6945 <br />FIRST ST. AND RAITT ST. SLURRY SEAL AND RESURFACING <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />15 <br />Adjust Water Valve Frame & Cover to <br />Grade <br />7 <br />EA <br />$ <br />q50.60 <br />$ D1 650.00Finished <br />16 <br />Adjust Survey Monument Frame and Cover <br />to Finished Grade <br />l <br />EA <br />$ 368.00 <br />0 v��0 <br />$ `n 6.00 <br />v U v <br />17 <br />Furnish and Install New #6 Pull Box <br />7 <br />EA <br />$ 5Q.00 <br />$ 31 ?0I.00 <br />18 <br />Protection of Surface Utility Collars, <br />Frames & Covers (First St) <br />I <br />LS <br />$ qq .00 <br />9lQf <br />$ qq <br />I q a1. QO <br />19 <br />Protection of Surface Utility Collars, <br />Frames & Covers (Raiff St) <br />1 <br />LS <br />$ 99� 00 <br />10b <br />$ 993.00 <br />20 <br />Temporary Construction Sign <br />4 <br />EA <br />$'; b16.00 <br />$ �I�I60•UO <br />21 <br />Project Advertisement Sign <br />4 <br />EA <br />$ �II�•rto <br />$ VI"fu00•Go <br />22 <br />Furnish and Install Traffic Loops Type D t <br />21 <br />EA <br />$ <br />$ 51 A60 00 <br />23 <br />Furnish and Install Traffic Loops Type E t <br />55 <br />EA <br />$ <br />"rIn <br />$11 a 115'00 <br />24 <br />Furnish and Install Bicycle Loops Type Q f <br />3 <br />EA <br />$ <br />Uo <br />$ n%Q® <br />25 <br />Signingand Striping (No Bike Lane) (First <br />S <br />1 <br />LS <br />$ q <br />uO6 00 <br />$ ��1 �f oo <br />26 <br />Signing and Striping (Raiff Street) <br />I <br />LS <br />$�11f1f7oa W <br />W15,000 Ull <br />27 <br />Labor Agreement Oversight <br />I <br />LS <br />$ 15,000 <br />$ <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.