My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - SB2 PLANNING GRANTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/05/2019
>
55B - RESO - SB2 PLANNING GRANTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2019 12:56:11 PM
Creation date
10/30/2019 11:41:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
55B
Date
11/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SB 2 Planning Grants Application <br />Attachment 2: Application Nexus to Accelerating Housing Production <br />Fill out Attachment 2 <br />Priority Areas AND other activities not designated as such. Applicants answering "Yes" to question 3 <br />in Section C and utilizing ONLY PrioritV Policy Area are automatically deemed to demonstrate a nexus <br />to accelerating housing production, and do not need to complete this form. <br />Pursuant to section Vlll, subsection (4) of the NOFA, applicants shall demonstrate how the application includes <br />a nexus to accelerating housing production. Please complete the following chart by providing information about <br />the current conditions and expected outcomes with respect to the planned activity and housing <br />production. Please attach documentation as necessary and see the NOFA for additional details. <br />Quantify how the activity accelerates production below and use Appendix B to explain the activity <br />and its nexus to accelerating housing production if necessary. <br />Type (Select at least one) <br />*Baseline <br />**Projected <br />***Difference <br />Notes <br />Timing (e.g., reduced number <br />of processing days) <br />1 year <br />6-8 months <br />4-6 months <br />See Appendix B <br />Development cost (e.g., land, <br />fees, financing, construction <br />costs per unit) <br />Approval certainty and <br />reduction in discretionary <br />review (e.g., prior versus <br />proposed standard and level of <br />discretion <br />Entitlement streamlining (e.g., <br />number of approvals) <br />Feasibility of development <br />2-4 per year <br />4-7 per year <br />75% - 250% <br />See Appendix B <br />Infrastructure capacity (e.g., <br />number of units) <br />Impact on housing supply and <br />affordability (e.g., number of <br />units) <br />* Baseline — Current conditions in the jurisdiction <br />(e.g. 6-month development application review, or existing number of units in a planning area) <br />**Projected — Expected conditions in the jurisdiction because of the planning grant actions <br />(e.g. 2-month development application review) <br />***Difference — Potential change resulting from the planning grant actions <br />(e.g., 4-month acceleration in permitting, creating a more expedient development process) <br />CA-HCD SB 2 PGP Pag§Pf 116 2019 Year-1 Grant Application <br />
The URL can be used to link to this page
Your browser does not support the video tag.