My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PowerPoint Special Presentation 3 State Route 55 Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/05/2019
>
PowerPoint Special Presentation 3 State Route 55 Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 7:31:25 PM
Creation date
11/5/2019 7:31:24 PM
Metadata
Fields
Template:
City Clerk
Date
11/5/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Limits operational improvements, generally within the existing ROW.A traffic study and extensive coordination resulted in the proposed addition of new lanes and interchange •Average <br /> daily traffic is expected to grow from 257,000 to 281,000 by 2055.•Existing traffic demand exceeds capacity.•55 in the PM.-55 in the AM and northbound (NB) SR-Traffic congestion exists <br /> on southbound (SB) SR•LimitsProject LimitsProject 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.