My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - STREET REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
20B - AA - STREET REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 7:26:22 PM
Creation date
11/12/2019 2:21:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
11/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 12 <br />CITY OF SANTA ANA <br />WOMEN OWNED/MINORITYBUSINESS OWNED ENTERPRISES <br />(W/MBE) GOOD FAITH EFFORTS <br />Project Name: <br />FK; io ,r„ OK S T 044 — Fy r8 19 EN <br />Project Number: <br />19 — 7sL$ <br />Project Location: <br />g el 118on S oh 401 <br />Pursuant to 24 CFR Part 85 § 85.36 (e) of Code of Federal Regulations, contractor must take all necessary <br />affirmative steps to assu re that minority business firms, women's business enterprises and labor surplus firms are <br />used whenever possible. <br />Contractor shall submit the following information to demonstrate that a goof faith effort has been made to comply <br />with the above section of the Code of Federal Regulations. Submittal of this form, in and of itself, may not <br />provide sufficient documentation to demonstrate that goof faith effort was made. Documentation such as <br />copies of advertisement, letters of solicitation, telephone logs, rejected quotes, etc. shou Id accompany this <br />form. <br />1. The names and dates of advertisement of each newspaper, trade paper, and minority -focus paper in which a <br />request for W/MBE participation for this project was placed by the bidder: <br />2. The names and dates of written notices sent to W/MBE soliciting bids for this project and methods used for <br />following up initial solicitation to determine with certainty whether the W/MBE were interested. <br />Names of <br />W/MBE Solicited <br />Dates of <br />Solicitation <br />Follow-up Methods <br />and Dates <br />Gr w6 <br />iZ ( c 11✓ <br />.err &ww i <br />The items of work which the bidder made available to W/MBE firms, including, where appropriate, any <br />breaking down of the contracts into economically feasible units to facilitate W/MBE participation, and the <br />information furnished to W/MBE such as plans, specifications, and requirements for the work. <br />Items of Work: % ^ir_ire_� /i✓11 <br />Breakdown of Items: 1` if <br />Information Furnished: Pul,is I}ivD SpBGS <br />FOOCS�PROPSVCSWUDFORMS\MBU5BO4AMB - Sectiw3Specs. DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.