My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - CARL THORNTON PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
23B - PROJ - CARL THORNTON PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 7:41:13 PM
Creation date
11/12/2019 2:52:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
11/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 3 <br />Thornton Park Restroom RE -BID (16-2654), bidding on July 3, 2019 2:00 PM (Pacific) <br />Bid Results <br />Type Item Code UOM Qty <br />Unit Price <br />Line Total Comment <br />20 Labor Agreement Oversight <br />LS 1 <br />$10,000.00 <br />$10,000.00 <br />Subtotal <br />$379,916.00 <br />Add Alternative One <br />21 Pedestrian Wooden Bridge <br />SF 150 <br />$200.00 <br />$30,000.00 <br />22 Irrigation and landscape Modification <br />SF 7500 <br />$5.00 <br />$37,500.00 <br />23 Rock Swale* <br />SF 480 <br />$12.00 <br />$5,760.00 <br />24 XiO Cloud SCADA Water Control System <br />LS 1 <br />$3,000.00 <br />$3,000.00 <br />Subtotal <br />$76,260.00 <br />Asterisk Notes (Per P-3 of Specifications) - NOT part of Total Bid Calculation <br />25 = The quantity for this bid item is shown for bid comparison only. This bid item shall <br />not be subject to the <br />"25%" limit as stated in Section 3-2 of the <br />Standard Specifications. <br />ea 1 <br />0 <br />0 <br />Subtotal <br />0 <br />Total <br />$456,176.00 <br />PlanetBids, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.