My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75D
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
CORRESPONDENCE - 75D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:16:37 PM
Creation date
11/13/2019 5:37:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
11/19/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Magnolia at the Park —The Addington <br />November 18, 2019 <br />Page 2 <br />Available <br />Queue <br />Without Project <br />I <br />Available <br />i Queue <br />Existing <br />AM _ <br />423' <br />_ PM <br />75, <br />Proposed <br />SOT <br />390' <br />300' <br />Op_ enin Year Conditions Project Quei <br />Available <br />Queue <br />Without Project <br />AM PM <br />456' 28T <br />Available <br />Queue <br />Existinil <br />Proposed <br />SBT <br />_ 39a' <br />300' <br />2040 Conditions P <br />Available Without Project <br />_Queue_ <br />AM I PM <br />SBT 1 390' <br />Available <br />With Project <br />AM PM <br />390' 302' <br />With Project <br />AM PM <br />469' � 296' <br />With Project <br />AM PM <br />SBT — Southbound Through Lanes <br />Bald indicates the queue is expected to extend into or past the Walkje Way/Project Site Entry <br />As shown in the Existing Conditions table, the addition of the project traffic and reduction of queuing <br />distance between the Edgewood Road and Walkie Way/Project Site Entry Intersections would result <br />in a project specific impact that has not been addressed or Identified in the DEIR nor FEIR. The project <br />could reduce the overall queue by 33 feet, however with the 90 foot reduction in overall queuing <br />distance, the queue would extend past the project site access; blocking any traffic from exiting the <br />proposed project and limiting the exiting traffic from the Oiscovery Cube Orange County. <br />In the Opening Year table above, the "with project" queue is 13 feet and 9 feet longer than the base <br />opening year AM and PM Peak Hour conditions, respectively. With the available queue distance being <br />reduced by 90 feet with the project, and the queue extending past the Walkie Way intersection, both <br />Walkie Way and the Project Access will be blocked during the AM Peak Hour. This is a project specific <br />impact that is not addressed or discussed in the DEIR or FEIR. <br />Finally, in the 2040 Conditions table, the southbound through movement queue is increased by 27 feet <br />and 14 feet for the AM and PM Peak Hour conditions, respectively. With the available queue distance <br />being reduced by 90 feet with the project, and the queue extending past the Walkie Way Intersection, <br />bath Walkie Way and the Project Access will be blocked during the AM Peak hour and the Project Access <br />will be blocked during the PM Peak Hour. This is a project specific impact that is not addressed or <br />discussed in the DEIR or FEIR. <br />We would recommend that the FEIR not be accepted by the City Council, until these significant project <br />specific impacts are discussed, addressed and mitigated. <br />Should you have any questions, feel free to contact us. <br />Sincerely, <br />I <br />Stephen A. Orosi P.E., T.E., PTOE <br />Traffic Engineer <br />Grosz Engineering Group, Inc. <br />=�4 <br />PO Box 2934 . Prescott . AZ . 86302 . 805-680-1586 . steveoeg57@gmail.com <br />CIVIL <br />
The URL can be used to link to this page
Your browser does not support the video tag.