Laserfiche WebLink
Phase <br />Number <br />Phase Name Phase Type Start Date End Date Num Days <br />Week <br />Num Days Phase Description <br />1 Demolition Demolition 3/2/2020 3/27/2020 5 20 <br />2 Site Preparation Site Preparation 3/28/2020 9/30/2020 5 133 <br />3 Building Construction Building Construction 10/1/2020 12/15/2021 5 315 <br />4 Paving Paving 2/16/2022 3/1/2022 5 10 <br />5 Architectural Coating Architectural Coating 8/2/2021 2/15/2022 5 142 <br />OffRoad Equipment <br />Residential Indoor: 445,500; Residential Outdoor: 148,500; Non-Residential Indoor: 20,025; Non-Residential Outdoor: 6,675; Striped Parking <br />Area: 7,968 (Architectural Coating ±sqft) <br />Acres of Grading (Site Preparation Phase): 1.7 <br />Acres of Grading (Grading Phase): 0 <br />Acres of Paving: 0 <br />CalEEMod Version: CalEEMod.2016.3.2 Date: 11/15/2019 11:07 AMPage 8 of 36 <br />4TH & Main Mixed-Use Project - Orange County, Annual