My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - TPM NO. 18-02
Clerk
>
Agenda Packets / Staff Reports
>
Zoning Administrator (2009-Present)
>
2019
>
07-31-19
>
1 - TPM NO. 18-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 5:16:11 PM
Creation date
11/20/2019 5:15:27 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LS 07.24.19 <br />Resolution No. 2019-xx <br />Page 6 of 6 <br />EXHIBIT A <br /> <br />Conditions of Approval <br /> <br />Tentative Parcel Map No. 2018-02 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the California Building Standards <br />Code and all other applicable regulations. <br /> <br />The Applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this approval. <br /> <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the tentative parcel map. Failure to comply with each and every condition may <br />result in the revocation of the tentative parcel map. <br /> <br />1. Two copies of the recorded final parcel map shall be submitted each to the <br />Planning Division, Building Division and Public Works Agency within 10 <br />days of recordation. <br /> <br />2. The tentative parcel map, final map and all improvements required to be <br />made or installed by the subdivider shall be in accordance with the <br />requirements and design standards and specifications of the City of Santa <br />Ana Municipal Code and the requirements of the State Subdivision Map <br />Act. <br /> <br />3. Prior to recordation of the final map, the Applicant shall submit for review <br />and approval Conditions, Covenants and Restrictions (CC&R’s) for the <br />project. At a minimum, the CC&R’s shall cover access, egress, drainage, <br />and landscape maintenance. <br /> <br />4. The project must be in compliance with the provisions of Development <br />Project Review/TPM (TPM No. 2018-02). <br /> <br />5. The property shall be maintained at all times. All weeds, debris and graffiti <br />shall be removed within 24 hours. Further, the perimeter fence shall be <br />maintained in a clean and sturdy condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.