Laserfiche WebLink
LS 11.20.19 <br />Resolution No. 2019-xx <br />Page 1 of 5 <br /> <br />RESOLUTION NO. 2019-xx <br /> <br />A RESOLUTION OF THE ZONING ADMINISTRATOR OF <br />THE CITY OF SANTA ANA APPROVING TENTATIVE <br />PARCEL MAP 2019-03 (COUNTY MAP NO. 2019-101) AS <br />CONDITIONED TO SUBDIVIDE AN EXISTING PARCEL <br />INTO TWO LOTS AT 645 NORTH ROSS STREET AND 333 <br />WEST SANTA ANA BOULEVARD <br /> <br />BE IT RESOLVED BY THE ZONING ADMINISTRATOR OF THE CITY OF <br />SANTA ANA AS FOLLOWS: <br />Section 1. The Zoning Administrator of the City of Santa Ana hereby finds, <br />determines and declares as follows: <br />A. Applicant is requesting approval of a Tentative Parcel Map to allow the <br />subdivision of an existing parcel into two lots at 645 North Ross Street and <br />333 West Santa Ana Boulevard. <br />B. Santa Ana Municipal Code Section 34-126 requires approval of a <br />Tentative Parcel Map by the Zoning Administrator. <br />C. On November 20, 2019, the Zoning Administrator held a duly noticed <br />public hearing on Tentative Parcel Map 2019-03. <br />D. The Zoning Administrator of the City of Santa Ana determines that the <br />following findings, which must be established in order to approve this <br />Tentative Parcel Map pursuant to Santa Ana Municipal Code (SAMC) <br />Section 34-126 and the State Subdivision Map Act, have been established <br />for Tentative Parcel Map 2019-03: <br />1. The proposed project, as conditioned, and its design and improvements <br />are consistent with the Institutional (INS) designation of the General Plan <br />and are otherwise consistent with all other Elements of the General Plan. <br /> <br />The proposed project, as conditioned, and its design and <br />improvements will be consistent with the Institutional land use <br />designation of the General Plan and are otherwise consistent with all <br />other elements of the General Plan and any applicable specific <br />plans. The proposed subdivision of land will create two parcels that <br />will remain consistent with the various provisions of the General Plan, <br />including the maximum allowable floor area ratio. <br /> <br />2. The proposed project, as conditioned, conforms to all applicable <br />requirements of the zoning and subdivision codes as well as other <br />applicable City ordinances.