My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-107 - Proposed Addington Multi-Family Residential Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-107 - Proposed Addington Multi-Family Residential Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 11:44:22 AM
Creation date
11/25/2019 11:00:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-107
Date
11/19/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vegetation on site, it would not result in either a new significant environmental impact or a substantial <br />increase in the severity of a previously identified impact. (Final FIR, Clarifications to the Final EIR, <br />Section 3.3.) <br />8.3 Hazards and Hazardous Materials <br />8.3.1 Accident Conditions Involving the Release of Hazardous Materials <br />Threshold: Would the Project create a significant hazard to the public or the environment through <br />reasonably foreseeable upset and accident conditions involving the release of hazardous material into the <br />environment? <br />Finding: Less than significant impact with mitigation incorporated. (DEIR, pp. 4.6-7 through 4.6-8.) <br />Facts in Support of Findings: Impacts related to hazards were evaluated in Section 4.6, Hazards and <br />Hazardous Materials, of the DEIR. As described, due to the existence of hazardous materials within on - <br />site soils, ground disturbing activity has the potential to result in the accidental release of hazardous <br />materials into the environment. The contaminated soils would need to be excavated and removed as <br />required by DTSC, California Integrated Waste Management Board, RWQCB, OCFA, and the Orange <br />County Health Care Agency (OCHCA). As a result, Mitigation Measure HAZ-1 has been required to <br />reduce the potential risks related to accidental release and exposure of people and the environment to the <br />contaminated soils. <br />Due to the existence of hazardous materials within on -site soils, Mitigation Measure HAZ-1 would be <br />implemented to reduce the potential risks related to accidental release and exposure of people and the <br />environment to these hazardous materials. Mitigation Measure HAZ-1 requires that a qualified consultant <br />prepare a Soil Management Plan (SMP) to be used by construction workers to remove and dispose of the <br />areas of arsenic impacted soil. Mitigation Measure HAZ-1 requires excavation of contaminated soils be <br />completed pursuant to existing DTSC and RWQCB requirements, soils sampling ensure all contaminated <br />soils are removed, and that a certified hazardous waste hauler remove and transport all arsenic impacted <br />soil and other potentially hazardous materials per California Hazardous Waste Regulations to a landfill <br />permitted by the state to accept hazardous materials. Excavated soil containing hazardous substances <br />would be classified as a hazardous waste if they exhibit the characteristics of ignitability, corrosivity, <br />reactivity, or toxicity (CCR, Title 22, Division 4.5, Chapter 11, Article 3). The SMP would detail <br />hazardous materials excavation and disposal methods and requirements pursuant to the regulation of Title <br />8 of the California Code of Regulations (CaIOSHA) and Department of Toxic Substances Control (DTSC) <br />that regulates the removal, transportation, and disposal of hazardous waste to protect human health and <br />the environment. With implementation of Mitigation Measure Haz-1 impacts related to hazards of the <br />onsite contaminated soils would be less than significant. <br />Mitigation Measure HAZ-1: Prior to issuance of a grading permit, a Soil Management Plan (SMP) shall <br />be prepared by a qualified hazardous materials consultant and shall detail procedures and protocols for <br />excavation and disposal of onsite hazardous materials, including: <br />• A certified hazardous waste hauler shall remove all potentially hazardous soils. Excavation of <br />contaminated soils shall be to the depth of approximately 0.5 feet below the existing ground surface <br />in areas identified as having arsenic impacted soils. In addition, sampling of soil shall be conducted <br />during excavation to ensure that all arsenic impacted soils are removed, and that residential <br />Resolution No. Page 16 of 76 <br />Certification of the Magnolia at the Park EIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.