My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - WATER SUPPLY ASSESSMENT FOR MAINPLACE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
12/03/2019
>
55C - WATER SUPPLY ASSESSMENT FOR MAINPLACE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:30:08 PM
Creation date
11/27/2019 11:03:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
12/3/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />TABLE OF CONTENTS <br />MainPlace Mall Transformation Project <br />Water Supply Assessment <br />1 INTRODUCTION...............................................................................................................................4 <br />1.1 Background..............................................................................................................................4 <br />1.1.1 Fashion Square Commercial Center Final EIR- 1983....................................................................4 <br />1.1.2 Addendum to the Final EIRfor MainPlace/SantaAna —2000....................................................4 <br />2 PROPOSED PROJECT DESCRIPTION...................................................................................................5 <br />2.1 Project Location.......................................................................................................................5 <br />2.2 Proposed Project......................................................................................................................5 <br />3 Regulatory Setting...........................................................................................................................9 <br />3.1 Purpose....................................................................................................................................9 <br />3.2 Senate Bill 610 and 221............................................................................................................9 <br />3.2 Water Conservation Act of 2009(SBx7-7)...............................................................................11 <br />4 Water Setting................................................................................................................................12 <br />4.1 City of Santa Ana Water Supply..............................................................................................12 <br />4.2 Retail Water Supply................................................................................................................12 <br />4.3 Water Rights/Groundwater Supply.........................................................................................13 <br />4.4 Reliability of Water Sources...................................................................................................15 <br />4.4.1 Normal -Year Reliability Comparison............................................................................................16 <br />4.4.2 Single Dry -Year Reliability Comparison........................................................................................17 <br />4.4.3 Multiple Dry -Year Period Reliability Comparison........................................................................17 <br />4.5 City of Santa Ana Water Infrastructure...................................................................................18 <br />4.5.1 Overall City Infrastructure............................................................................................................18 <br />4.5.2 System Pressures..........................................................................................................................19 <br />4.5.3 Local Project Infrastructure..........................................................................................................19 <br />4.6 Project Water Demand........................................................................................................... <br />20 <br />4.7 Water Shortage Contingency Plan..........................................................................................22 <br />4.7.1 Demand Management Measures (DMM)...................................................................................23 <br />Summaryand Conclusions.....................................................................................................................24 <br />References............................................................................................................................................ <br />25 <br />Kimley»)Horn 55C-9 Page ) i <br />
The URL can be used to link to this page
Your browser does not support the video tag.