My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-12-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
12/03/2019
>
FULL PACKET_2019-12-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 4:26:33 PM
Creation date
11/27/2019 4:12:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
12/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41. Pre -Construction Meeting. Prior to the commencement of construction on the site, the developer <br />shall schedule a pre -construction meeting between the general superintendent or field <br />representative and the Planning Division to discuss the approved plans and construction <br />requirements. <br />ENGINEERING <br />42. The Applicant shall submit Improvement Plans prepared by a Registered Civil Engineer for public <br />works (off -site) improvements, and on -site improvements. Plan check fees shall be paid in advance. <br />43. An on -site grading and drainage plan shall be prepared and submitted to the City Engineer for <br />approval. Plan shall be 24" x 36", with elevations to nearest 0.01 foot, minimum scale I" = 20'. <br />Plan shall be prepared by Registered Civil Engineer. Public works improvements may be shown <br />on this plan. Grading plan check fees must be paid in advance. <br />44. Hydrologic and hydraulic calculations demonstrating adequate site drainage from a 10-year return <br />frequency storm (25-year frequency in sump areas) prepared by a Registered Civil Engineer shall <br />be submitted with the Grading Plan. <br />45. Driveway slope shall be a minimum slope of one (1) percent for asphalt and .5% for concrete. <br />46. If utility cuts are excessive in the street the street must have a grid and overlay placed on it per the <br />satisfaction of the City Engineer. <br />47. All existing off -site public improvements (sidewalk, curb and gutter, driveways, and street paving) <br />at the development site which are in a damaged condition or demolished due to the proposed work <br />shall be reconstructed to the satisfaction of the City Engineer, and per OCPFRD Standard Plan. <br />48. A City Encroachment (Public Works) permit shall be taken out for all work in public right-of-way <br />prior to start of work. All work shall be done in accordance with APWA Standards and to the <br />satisfaction of the City Engineer and must be completed prior to final approval for occupancy or <br />the issuance of Certificate of Occupancy. <br />49. A bond or surety device shall be posted with the City in an amount and type sufficient to cover the <br />amount of off -site work to be done, as approved by the City Engineer. <br />50. Pad certification by the Design Civil Engineer and Soil Engineer is required prior to the <br />commencement of structural construction. <br />51. Final compaction report prepared by a qualified Soil Engineer shall be submitted to the City <br />Engineer for review and approval prior to the commencement of structural construction. <br />52. Prior to the issuance of any grading or building permits or prior to recordation upon subdivision of <br />land if determined applicable by the City Building Official, the applicant shall submit to the City <br />for review and approval a Final Water Quality Management Plan (WQMP) that: <br />55394.00002 315531'ST I 11 A-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.