Laserfiche WebLink
CaIEEMod Version: CalEEMod.2016.3.2 Page 8 of 36 Date: 11/15/2019 11:07 AM <br />4TH & Main Mixed -Use Project - Orange County, Annual <br />Phase <br />Number <br />Phase Name <br />Phase Type <br />Start Date <br />End Date <br />Num Days <br />Week <br />Num Days <br />Phase Description <br />1 ;Demolition +Demolition <br />13/2/2020 <br />:3/27/2020 <br />5: <br />20: <br />+ <br />i <br />2 •Site Preparation +Site Preparation <br />13/28/2020 <br />:9/30/2020 <br />5: <br />133: <br />+ <br />i <br />3 •Building Construction +Building Construction <br />110/1/2020 <br />:12/15/2021 <br />5� <br />315� <br />+ <br />i <br />4 :Paving +Paving <br />12/16/2022 <br />:3/1/2022 <br />� 5: <br />10: <br />+ <br />i <br />5 •Architectural Coating :Architectural Coating <br />8/2/2021 <br />2/15/2022 <br />5• <br />142, <br />Acres of Grading (Site Preparation Phase): 1.7 <br />Acres of Grading (Grading Phase): 0 <br />Acres of Paving: 0 <br />Residential Indoor: 445,500; Residential Outdoor: 148,500; Non -Residential Indoor: 20,025; Non -Residential Outdoor: 6,675; Striped Parking <br />Area: 7,968 (Architectural Coating — sgft) <br />OffRoad Equipment <br />