My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 60A
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
12/03/2019
>
CORRESPONDENCE - 60A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:35:28 PM
Creation date
12/2/2019 12:02:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Failure to Demonstrate Consistency with the FOR <br />According to the Addendum, "the project would not result in any new or substantially more severe GHG <br />emissions impacts than what was analyzed in the 2010 FEIR and project GHG emissions would not be <br />significant. Mitigation Measures 4.13-8 through 4.13-23 from the 2010 FEIR would be applicable to the <br />proposed project" (p. 3.5-2). However, this is incorrect, as the Addendum fails to substantiate this <br />conclusion. <br />Review of the Addendum demonstrates that several of the mitigation measures identified in the 2010 <br />FEIR are not substantiated or implemented in the Addendum. According to the Addendum, <br />"[Mjitigation measures applied to the proposed project include all diesel fuel construction <br />equipment classified Untied States Environmental Protection Agency (USEPA) Tier II or better <br />(Mitigation Measure 4.13-1), all construction equipment shut off when not in use and not idling <br />for more than five minutes (Mitigation Measure 4.13-2), electrical powered equipment used to <br />the extent feasible(Mitigation Measure 4.13-5), exceedance of Title 24 requirements (Mitigation <br />Measure 4.13-8), drought tolerant landscaping (Mitigation Measure 4.13-9), low flow showers <br />and faucets in residences (Mitigation Measure 4.13- 10), ride sharing programs (Mitigation <br />Measure 4.13-16), fluorescent lighting (Mitigation Measure 4.13-17), and 10 percent renewable <br />energy for the commercial project component (Mitigation Measure 4.13-24)" (p. 3.5-1). <br />However, this justification and attempt at compliance with the FEIR is incorrect for several reasons. <br />First, the Addendum fails to actually commit to the use of these mitigation measures or discuss how <br />they will be implemented, monitored, and enforced. Without further analysis by the Addendum <br />describing how the proposed Project will apply these mitigation measures, we cannot assume that they <br />will be implemented or enforced. Furthermore, the Addendum fails to address several of the mitigation <br />measures between 4.13-8 through 4.13-23 that are included in the FEIR (see table below). <br />Measure Addendum Consistency <br />Construction Measures <br />MM 4.13-1 Here, the Addendum states that the Project will <br />All diesel fueled construction equipment shall be "include all diesel fuel construction equipment <br />classified EPA Tier 11 or better emission efficiencies. classified United States Environmental Protection <br />Agency (USEPA) Tier II or better" (p. 3.5-1). <br />However, this is all that is stated and as such, the <br />Addendum fails to demonstrate a commitment to <br />implementation, monitoring, and enforcement of <br />the measure. Thus, we cannot verify that all diesel- <br />zz "Transit Zoning Code Environmental Impact Report." City of Santa Ana, May 2010, available at: <br />https://www.santa-ana.org/sites/default/files/Documents/18 Sec4-13 GlobalClimateChange.pdf, Chapter 4.13, <br />Global Climate Change. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.