Laserfiche WebLink
If you are the apparent low, please inform CPE within 48 hours. Long lead materials apply. <br />CALIFORNIA PROFESSIONAL ENGINEERING, INC. <br />19-3104 <br />-------------- <br />Project Name: Bristol/ Edinger Bike Ln <br />Project #: 18-6906 <br />Agency: CITY OF SANTA ANA <br />Bid Due Date: 1012312019 <br />929 Otterbein Avenue Unit E, La Puente, CA 91748 <br />License # 793907 Exp: 04/30/2021 <br />Classifications: A, C-10, C-20 <br />LSBE Certified LA County #54567 Exp: 11/30/2020 <br />SBE Certified DGS #54567 Exp: 11/30/2020 <br />SMBE/DBE/UDBE Certified Caltrans #31277 <br />DIR #1000377609 Exp,06/30/2020 <br />Union Signatory Laborer's Local and IBEW <br />Bid Due Time: 2:00 PM <br />Conditions Set Forth: <br />1. Estimate based on one (1) mobilization unless noted otherwise. Additional mobilization at $3,500.00/ea. <br />2. If loop work: stubout must be existing & marked If not called out to be replaced per plans. Cat -tracking shall be approved prior. Should loop <br />quantities be decreased, a minimum mobilization of $4,500.00 shall supersede. <br />3. One work day based on eight (8) standard consecutive work hours per day. At least 3-weeks notification required; subject to scheduling availability. <br />4. Quote valid for thirty (30) days. CPE reserves the right to revise our quotation as necessary. <br />5. Should HKA be the acting consultant/inspectors on behalf of the Agency, CPE reserves the right to withdraw our bid. <br />CPE is pleased to provide this esiinmie fur the intended use ofEhe Contrador tofurnish (nborand/or material in strict accordance with fbePlana and speel ,ca6bns xs,/cillourc: <br />Item`# <br />77 <br />Uescrrptlon` <br />UQM <br />�EA <br />QtY <br />lnit Prlc ' <br />` I'll`' ; ,NSubtotal <br />14 <br />Install Type "E" Loop <br />73 <br />225.00 <br />16,425.00 <br />*DLC Is Included where called out for on the <br />plans <br />14.1 <br />Install Type "Q" Bike Loop <br />EA <br />12 <br />325.00 <br />3,900.00 <br />*DLC is Included where called out for on the <br />plans <br />14.2 <br />Install Type "D" Bike Loop <br />EA <br />41 <br />325.00 <br />13,325.00 <br />*DLC is included where called out for on the <br />I <br />plans <br />19 <br />Remove existing pull box and Install new No. 5 <br />EA <br />2 <br />800.00 <br />1,600.00 <br />traffic rated pull box <br />I23 <br />Install video detection system at Bristol St, & <br />LS <br />1 <br />30,700.001 <br />30,700.00 <br />Alton Ave <br />Exclusions: Bond & Bond Premium; Overtime and/or Nighttime Rates; All Permits; All Training Requirements; Signage; Lane Closure Request, Traffic <br />Control, and Traffic Control Plan; Light Towers; CMS boards; Sharing; Water; Sidewalk & Surface Concrete; Regulatory Signs; Hauling Dirt, Debris, & <br />Concrete Foundation Away; Handicap Ramps; Repaving Street; Repaving Potholes; Saw Cutting; USA Marking Removals; Irrigation Work; Dewatering; <br />Striping; Survey; Fencing; Cold/Hot Mix; Temp. Asphalt; Inspection Fees; Temporary Loops; Temporary Signal; and/or High Voltage Line Conflicts, <br />Unless Otherwise Noted Above, Standard Certificate of Insurance will be provided upon request, Any additional requirements will be billed at cost. <br />Hot Mix Asphalt shall be provided by Contractor to CPE to backfill any potholes and/or excavations. If It is not provided and we utilize temporary Cold <br />Mix, CPE will not be held liable for any claims that may derive from such pothole and/or excavated location. <br />Terms: Unless other arrangements are made, payment Is due & payable withinin 30 days upon completion; 1.5°/a monthly interest will apply <br />thereafter, Bid based on entire bill of material and services and is inseparable unless written authorization is provided by CPE. <br />Acceptance TOTAL: <br />$65,950.00 <br />Ph: (626) 810-1338 / Fx: (626) 810-20D#4Istimating@cpengineeringinc.com <br />