My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20D - AA BRISTOL AND EDINGER BIKE LANES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
12/17/2019
>
20D - AA BRISTOL AND EDINGER BIKE LANES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 2:47:48 PM
Creation date
12/12/2019 2:35:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20D
Date
12/17/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-6906 <br />EDINGER AVE. AND BRISTOL ST. CLASS 11 BICYCLE LANES <br />FEDERAL PROJECT NO: HSIPL 5063(180) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: All American Asphalt <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Install Thermoplastic White Lane Line <br />"I" <br />15,815 <br />LF <br />$ qj <br />$ �/ i <br />/l <br />Per City of SA (1125B-1, Detail ) <br />,—V7. <br />2 <br />Install New 2" Square Steel Post and Sign <br />41 <br />EA <br />$ <br />?jq.T9 <br />$ gt$ `O �� <br />Per (STD.Plan 1504) <br />3 <br />Install New Sign <br />31 <br />EA <br />$ <br />$ <br />5 <br />Install Thermoplastic 6" Solid White Bike <br />"39") <br />26,016 <br />LF <br />$ <br />1.00 <br />$ i <br />2�i, 0Ib <br />Lane Line (CT A20D, Detail <br />6 <br />Install Thermoplastic 6" Dashed White <br />"39A") <br />5,515 <br />LF <br />$ ��U <br />$ S s`s , <br />Bike Lane Line ( CT A20D, Detail <br />r <br />7 <br />Bike Lane Legend (Detail "A") <br />52 <br />EA <br />$ <br />79�, 62 <br />$ yo/ V o�. 2� <br />bo <br />8 <br />Bike Lane Merging Area (MMA) <br />11,641 <br />SF <br />$ I <br />Imo/ <br />$ <br />9 <br />Install Thermoplastic 6" White Stripe <br />2,661 <br />LF <br />$ <br />� <br />$ 7 6•S•�-� <br />Every 20' O.0 at 45 deg. <br />(A <br />t <br />10 <br />Install Thermoplastic Turn Lane Line Per <br />"2") <br />3.298 <br />LF <br />$ <br />1.y3 <br />$ yr7�b )� <br />-1 <br />City of SA (I 125B-1, Detail <br />I I <br />Install Signs Noted Facing Opposite Flow <br />53 <br />EA <br />$ <br />h <br />of Traffic B-to-B <br />- <br />r <br />12 <br />Install or Refresh Thermoplastic Legends <br />80 <br />EA <br />$ SS�`� I <br />$ 6 g76 g0 <br />and Arrows, as Shown <br />V <br />13 <br />Remove Conflicting Striping <br />15,537 <br />1 LF <br />$ U�/�t <br />I I-3 <br />$ <br />(Grinding/Sandblasting) <br />- <br />L212�1,�1� <br />13.1 <br />Remove Legends and Arrows <br />(Grinding/Sandblasting) <br />19 <br />EA <br />$ <br />M-08 <br />$ <br />1 yotsz <br />14 <br />Install Type "E" Loop <br />73 <br />EA <br />$ <br />$ <br />14.1 <br />Install Type "Q" Bike Loop <br />12 <br />EA <br />$ <br />y(,s 60 <br />$ <br />&I ss'i,za <br />14.2 <br />Install Type "D" Bike Loop <br />41 <br />EA <br />$ gt;S.&0 <br />$ H08q.6o <br />P-1 of P-40 <br />20D-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.