Laserfiche WebLink
ADDENDUM FOUR <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.; 17-6880 <br />SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />33 <br />Traffic Signs <br />179 <br />EA <br />$400.00 <br />$ 71,600100 <br />34 <br />Signing and Striping Removals <br />1 <br />LS <br />$35,000.00 <br />$ 35,000.00 <br />Traffic Signal Modification <br />35 <br />Traffic Signal and Signal <br />1 <br />LS <br />$ rto,000.06 <br />$ tto,000.00 <br />Interconnect (5th St and Main St) <br />36 <br />Traffic Signal and Signal <br />1 <br />LS <br />$ 100,000.00 <br />S 100,006.00 <br />Interconnect (5th St and Broadway) <br />37 <br />Traffic Signal and Signal <br />1 <br />LS <br />$ 95,000.00 <br />$ 96,000.00 <br />Interconnect (5th St and Bush St) <br />38 <br />Video Detection System at 5"' St and <br />I <br />LS <br />$ 40,000.00 <br />$40,000.00 <br />Broadway <br />39 <br />Video Detection System at 5"' St and <br />1 <br />LS <br />$ 40,000.00 <br />$ 40,000.00 <br />Main St <br />40 <br />Video Detection System at 5d' St and <br />1 <br />LS <br />$ 40,000.00 <br />$ 40.000.00 <br />Bush St <br />41 <br />Install 2" PVC Conduits <br />160 <br />LF <br />$ 60.00 <br />$ 9,600.00 <br />42 <br />Install 3" PVC Conduits <br />60 <br />LF <br />$ 70.00 <br />$ 4,200.00 <br />43 <br />Install 4" PVC Conduits <br />350 <br />LF <br />$ s5.00 <br />$ 33,250.00 <br />44 <br />12 — SMFO Cable <br />1,225 <br />LF <br />$ 3,675.00 <br />45 <br />Fusion Spice I Strand SMFO <br />2 <br />EA <br />L3.00 <br />$ 600.0046 <br />IP Communication System at 5"' St <br />I <br />LS <br />$16,000.00 <br />and Broadway <br />47 <br />CCTV and IP Communication <br />System at 51h St and Main St <br />I <br />LS <br />$ 18,06c.00 <br />$18,006.00 <br />Landscape and Irrigation <br />48 <br />Landscape ** <br />1 <br />LS <br />$130,000.00 <br />$ 130,000.00 <br />49 <br />Planting of Shrubs and Succulents by <br />I <br />LS <br />$ 2,816 <br />$ 2,816 <br />OCCC <br />50 <br />Irrigation <br />I <br />LS <br />$450,000.00 <br />$450,000.00 <br />51 <br />120 Day Plant Maintenance and <br />I <br />LS <br />$6,000.00 <br />$ 6,000.00 <br />Establishment Period <br />P-3 ofP-19 <br />20E-13 <br />