My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11B - ORDINANCE CH. 8 AND 14
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
12/17/2019
>
11B - ORDINANCE CH. 8 AND 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 2:45:43 PM
Creation date
12/12/2019 2:36:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
11B
Date
12/17/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2808.7 Pile fire protection. Automatic sprinkler protection shall be provided in <br />conveyor tunnels and combustible enclosures that pass under a pile. Combustible <br />conveyor systems and enclosed conveyor systems shall be equipped with an <br />approved automatic sprinkler system. Oscillating sprinklers with a sufficient <br />projectile reach are required to maintain a 40% to 60% moisture content and wet <br />down burning/smoldering areas. <br />(f) Section 2808.9 Material -handling equipment is hereby revised as follows: <br />2808.9 Material -handling equipment. All material handling equipment operated by <br />an internal combustion engine shall be provided and maintained with an approved <br />spark arrester. Approved material -handling equipment shall be available for moving <br />wood chips, hogged material, wood fines and raw product during fire -fighting <br />operations. <br />(g) Section 2808.11 Temperature control, is hereby added as follows: <br />2808.11 Temperature control. The temperature shall be monitored and maintained <br />as specified in Sections 2808.11.1 and 2808.11.2. <br />(h) Section 2808.11.1 Pile temperature control, is hereby added as follows: <br />2808.11.1 Pile temperature control. Piles shall be rotated when the internal <br />temperature readings are in excess of 165 degrees Fahrenheit. <br />(i) Section 2808.11.2 New material temperature control, is hereby added as follows: <br />2808.11.2 New material temperature control. New loads delivered to the facility <br />shall be inspected and tested at the facility entry prior to taking delivery. Material <br />with temperature exceeding 165 degrees Fahrenheit shall not be accepted on the <br />site. New loads shall be monitored to verify that the temperature remains stable. <br />Q) Section 2808.12 Water availability is hereby added as follows: <br />2808.12 Water Availability. Facilities with over 2500 cubic feet shall provide a <br />water supply. The minimum fire flow shall be no less than 500 GPM @ 20 psi for a <br />minimum of 1 hour duration for pile heights up to 6 feet and 2 hour duration for pile <br />heights over 6 feet. If there is no water purveyor, an alternate water supply with <br />storage tank(s) shall be provided for fire suppression. The water supply tank(s) shall <br />provide a minimum capacity of 2500 gallons per pile (maximum 30,000 gallons) for <br />piles not exceeding 6 feet in height and 5000 gallons per pile (maximum 60,000) for <br />piles exceeding 6 feet in height. Water tank(s) shall not be used for any other <br />purpose unless the required fire flow is left in reserve within the tank at all times. An <br />approved method shall be provided to maintain the required amount of water within <br />the tank(s). <br />(k) Section 2808.13 Tipping area is hereby added as follows: <br />2808.13 Tipping areas shall comply with the following: <br />1. Tipping areas shall not exceed a maximum area of 50 feet by 50 feet. <br />Ordinance No. NSAXXX <br />Page 20 of 29 11 B-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.