My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - CA PROFESSIONAL ENGINEERING FOR BIKE TRAIL AND SADDLEBACK PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
12/17/2019
>
23A - CA PROFESSIONAL ENGINEERING FOR BIKE TRAIL AND SADDLEBACK PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 5:44:31 PM
Creation date
12/12/2019 5:33:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/17/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
929 Otterbein Ave., Unit E <br />La Puente, CA 91748 <br />Ph: (626) 810-1338 <br />Fax: (626) 810-1322 <br />www.cg=gineeringinc.com <br />CaliforniaProfessional Engineering, <br />Street Lighting -Job References <br />PROJECTS: <br />Design — Build High Voltage Streetlight System Rewiring <br />Amount: $547,044.66 <br />Owner: City of Santa Ana <br />Project Manager: Tyrone Chesonek <br />Email: tchesonek@santo-ona.org <br />Contact Phone #: (714) 647-5690 <br />Fax #: (714) 647-5622 <br />Status: Completed <br />Approximate Start/End Dates: Feb 2015-March 2016 <br />Description of Supplies, Equipment, or Services Provided: Convert High Voltage <br />Wiring to Low Voltage Wiring, Design/Build, Installation of Lighting Fixtures, <br />and Conduit. <br />Installation of Sport Field Lighting System <br />Amount: $65,501.00 <br />Owner: City of Huntington Park <br />Project Manager:Josette Espinosa <br />Email: jespinosa@hpco.gov <br />Contact Phone #: (323) 584-6216 <br />Fax #: (323) 588-4577 <br />Status: Completed <br />Approximate Start/End Dates: Dec 2015-Jan 2016 <br />Description of Supplies, Equipment, or Services Provided: Installation of Conduit & <br />Wiring, Pull Box, Sports Field Lighting Fixtures, and Lighting Poles. <br />Firestone Blvd Improvement Project <br />Amount: $409,305.58 <br />Owner: City of Downey <br />Project Manager: Keith Hoey <br />Page 1 of <br />1)01I'Meni Lm-1 Up�lnted 4 J 2016 <br />23A-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.