Laserfiche WebLink
City of Santa Ana <br />Page 2 <br />Bristol St. Rehabilitation: MacArthur Blvd. to Railroad (N. of Alton Ave.) <br />(19-6943), bidding <br />on October 24, 2019 2:00 <br />PM Printed 11/20/2019 <br />Bid Results <br />Type <br />Item Code <br />UOM <br />Qty <br />Unit Price <br />Line Total Comment <br />4 <br />Asphalt Pavement <br />TN <br />242 <br />$155.00 <br />$37,510.00 <br />5 <br />Asphalt Rubber Hot Mix (ARHM) <br />TN <br />1500 <br />$100.00 <br />$150,000.00 <br />6 <br />ARAM <br />SY <br />15300 <br />$6.30 <br />$96,390.00 <br />7 <br />PCC Sidewalk (4") <br />SF <br />1454 <br />$10.00 <br />$14,540.00 <br />8 <br />PCC Curb Ramp <br />SF <br />1820 <br />$10.70 <br />$19,474.00 <br />9 <br />PCC Curb & Gutter (Type A-2-8) <br />SF <br />220 <br />$49.00 <br />$10,780.00 <br />10 <br />Survey Monument <br />LF <br />2 <br />$425.00 <br />$850.00 <br />11 <br />Truncated Dome <br />EA <br />13 <br />$875.00 <br />$11,375.00 <br />12 <br />Furnish and Install Water Valve Frame and Coverto Finished Grade <br />EA <br />13 <br />$795.00 <br />$10,335.00 <br />13 <br />Adjust Manhole Frame & Cover to Finished Grade <br />EA <br />4 <br />$900.00 <br />$3,600.00 <br />14 <br />Furnish and Install #6 Pullbox to Finished Grade <br />EA <br />11 <br />$722.00 <br />$7,942.00 <br />15 <br />Furnish and Install Traffic Loops D t <br />EA <br />21 <br />$245.00 <br />$5,145.00 <br />16 <br />Furnish and Install Traffic Loops E t <br />EA <br />50 <br />$218.00 <br />$10,900.00 <br />17 <br />Furnish and Install Traffic Loops Q t <br />EA <br />3 <br />$245.00 <br />$735.00 <br />18 <br />Temporary Construction Sign <br />EA <br />5 <br />$1,050.00 <br />$5,250.00 <br />19 <br />Project Advertisement Sign <br />EA <br />.. <br />$1,500.00 <br />$3,000.00 <br />23B-6 <br />