Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-2679 & 18-2680 <br />CIVIC CENTER IMPROVEMENTS <br />JAPANESE PAVILION IMPROVEMENTS: <br />Item <br />Description Qty <br />Unit Unit Amount <br />32 <br />Clearing & Grubbing 1 <br />Price <br />LS <br />33 <br />Unclassified Excavation 25 <br />CY $ 126.40 $ 3,6to.oa <br />34 <br />Re -locate Existing Boulders 1 <br />LS $ 1,6+2.cD $ i,842.A7 <br />35 <br />Electrical Power Feed l <br />LS $'1, lo. cm $ -7, 1OSS 00 <br />36 <br />Stamped Concrete Paving 660 <br />SF $13.8o $�j loS.�o <br />37 <br />Low Rail Wood Fence 305 <br />LF <br />$ 7 3. pb $ 22, 2.pS. c8 <br />38 <br />Steel Edging <br />435 <br />LF <br />$ <br />$ <br />2s.oZ, <br />!o, 87S.ep <br />39 <br />Bird Mesh <br />1 <br />LS <br />$ 3q,g3c. o <br />$ 34, 830. oa <br />40 <br />Tectum Panels <br />700 <br />EA <br />41 <br />Remove and Replace Non -Structural <br />1 <br />LS <br />$ S5, ta3. <br />$ <br />Lumber <br />SSt 143.co <br />42 <br />Remove and Replace Structural <br />Lumber <br />25 <br />EA <br />$ 4! Ic <br />$ !c`I, 2 b.w <br />43 <br />Furring and Trim at Wood Posts <br />30 <br />EA <br />$ 1 ibz.rm <br />$ 34.8io0e6 <br />44 <br />Power Wash Flagstone Paving <br />1 <br />LS <br />$ 3,os-1.ab <br />$ 3,0&9.00 <br />45 <br />Replace Missing Flagstone Paving <br />1 <br />LS <br />$ 2,ilb.W <br />46 <br />Clean, Prepare and Paint Existing <br />1 <br />LS <br />$ 1, <br />$ 39, <br />Structure <br />72, <br />E z . Z <br />47 <br />Install New Infrastructure for Lighting <br />1 <br />LS <br />$ <br />48 <br />New Light Fixtures <br />10 <br />EA <br />$ f�}53.e� <br />$ 14i 530. o) <br />49 <br />Soil Preparation and Fine Grading <br />2,775 <br />SF <br />50 <br />Irrigation <br />3,400 <br />SF <br />$ S.S3 <br />51 <br />36"Box Trees <br />5 <br />EA <br />T 4672-00 <br />P-2,31Os13 <br />