My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA FY 2019-30 CIP FLOWER ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
20C - AA FY 2019-30 CIP FLOWER ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 7:03:23 PM
Creation date
1/16/2020 5:56:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />Gas Tax Local Street Improvements FY 19/20 & Flower Street Sewer Manhole <br />Improvements <br />(Project Nos. 20-6956 & 20- Printed 01/06/2020 <br />Bid Results <br />Type <br />Item Code UOM <br />Qty <br />Unit Price <br />Line Total Comment <br />4 <br />Coldmill (3") <br />SF <br />13230 <br />$0.90 <br />$11,907.00 <br />5 <br />Removal of 6" PCC at Various Locations <br />CY <br />1680 <br />$138.00 <br />$231,840.00 <br />6 <br />Construct 6" PCC with (3-day) Cure including Dowels <br />CY <br />1680 <br />$408.00 <br />$685,440.00 <br />7 <br />Crack Seal with Deere Super Gray' <br />LF <br />15750 <br />$3.10 <br />$48,825.00 <br />8 <br />Construct PCC V-Gutter Longitudinal (T=8") <br />LF <br />4730 <br />$37.00 <br />$175,010.00 <br />9 <br />Construct PCC Sidewalk (T=4") <br />SF <br />810 <br />$10.50 <br />$8,505.00 <br />10 <br />Construct PCC Driveway Approach (T-6") <br />SF <br />1210 <br />$14.00 <br />$16,940.00 <br />11 <br />Construct PCC Curb Ramp <br />SF <br />7880 <br />$16.20 <br />$127,656.00 <br />12 <br />Construct PCC Curb & Gutter (Type A-2-6) <br />LF <br />710 <br />$53.00 <br />$37,630.00 <br />13 <br />Construct Cross -Gutter <br />SF <br />3890 <br />$19.00 <br />$73,910.00 <br />14 <br />PCC Grinding <br />LF <br />50 <br />$95.00 <br />$4,750.00 <br />15 <br />Root Shave <br />EA <br />5 <br />$900.00 <br />$4,500.00 <br />16 <br />Adjust Manhole Frame and Cover to Finished Grade <br />EA <br />23 <br />$995.00 <br />$22,885.00 <br />17 <br />Furnish and Install New Water Valve Frame and Cover to Grade <br />EA <br />38 <br />$875.00 <br />$33,250.00 <br />18 <br />Construct New PCC Sewer Manhole <br />EA <br />3 <br />$19,242.00 <br />$57,726.00 <br />19 <br />Construct New PCC Drop Sewer Manhole with two drop connections <br />EA <br />1 <br />$40,127.00 <br />$40,127.00 <br />20CA 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.