My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA FY 2019-30 CIP FLOWER ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
20C - AA FY 2019-30 CIP FLOWER ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 7:03:23 PM
Creation date
1/16/2020 5:56:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA PROJECT 2089% GASTAX LOCAL STREET IMPROVEMETNS FV 192O <br />PROJECT 206437 FLOWER STREET SEWER MANHOLE IMPROVEMENTS <br />PROPOSAL ADDENDUM ONE <br />PROJECT NO.: 20-6956 <br />GAS TAX LOCAL STREET IMPROVEMENTS FY 19/20 <br />PROJECT 20-6437 <br />FLOWER STREET SEWER MANHOLE IMPROVEMENTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: EBS General Engineering, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Asphalt Rubber Hot -Mix (ARHM) <br />1,380 <br />TN <br />$ <br />$ <br />109 <br />150,420 <br />2 <br />Crushed Miscellaneous Base (CMB) <br />290 <br />TN <br />$ <br />$ <br />129 <br />37,410 <br />3 <br />Coldmill (2") <br />38,530 <br />SF <br />$ <br />$ <br />0.70 <br />26,971 <br />4 <br />Coldmill (K) <br />13,230 <br />SF <br />$ <br />$ <br />0.90 <br />11,907 <br />5 <br />Removal of 6" PCC at Various <br />1,680 <br />CY <br />$ <br />$ <br />Locations <br />138 <br />231,840 <br />6 <br />Construct 6" PCC with (3-day) Cure <br />1,680 <br />CY <br />$ <br />$ <br />including Dowels <br />408 <br />685,440 <br />7 <br />Crack Seal with Deere Super Gray* <br />15,750 <br />LF <br />$ <br />$ <br />3.10 <br />48,82 <br />8 <br />Construct PCC V-Gutter <br />4,730 <br />LF <br />$ 37 <br />$ 175,010 <br />Longitudinal (T=8") <br />9 <br />Construct PCC Sidewalk (T=4") <br />810 <br />SF <br />$ <br />$ <br />10.50 <br />8505 <br />10 <br />Construct PCC Driveway Approach <br />1,210 <br />SF <br />$ <br />$ <br />(T=6") <br />14 <br />16,940 <br />11 <br />Construct PCC Curb Ramp <br />7,880 <br />SF <br />$ <br />$ <br />16.20 <br />127,656 <br />12 <br />Construct PCC Curb & Gutter (Type <br />710 <br />LF <br />$ <br />$ <br />A-2-6) <br />53 <br />37,630 <br />13 <br />Construct Cross -Gutter <br />3,890 <br />SF <br />$ <br />$ <br />19 <br />73,910 <br />494; <br />
The URL can be used to link to this page
Your browser does not support the video tag.