My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA FY 2019-30 CIP FLOWER ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
20C - AA FY 2019-30 CIP FLOWER ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 7:03:23 PM
Creation date
1/16/2020 5:56:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 YEAR REFERENCES — PUBLIC WORKS <br />S. Proiect Name <br />Palos Verdes Southbound Right Turn Lane at PCH <br />Owner <br />City of Redondo Beach <br />Principal Contact Phone <br />Didar Khander, P.E. (310) 318-0661 x 2456 <br />Price of Contract Dates <br />$219,570 10/2017 — 7/2018 <br />Construction of Right -Turn Lane: Minor PCC, Asphalt Grind & Pave, Adjust Utilities <br />6. Proiect Name <br />Citywide Pothole Repairs <br />Owner <br />City of Compton <br />Principal Contact Phone <br />John Strickland, Project Manager 310-761-1422 <br />Price of Contract Dates <br />$640,000 9/2018—12/2017 <br />Type of Work <br />Pothole Preparation, Asphalt Installation <br />20C-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.