My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA FY 2019-30 CIP FLOWER ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
20C - AA FY 2019-30 CIP FLOWER ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 7:03:23 PM
Creation date
1/16/2020 5:56:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gas Tax Local Street Improvements FY 19120 <br />Street Improvements - <br />Local Street Resurfacing <br />EXHIBIT 2 <br />CITY OF SANTA ANA FY 19120 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />IOJECT DESCRIPTION: <br />is project entails the rehabilitation of existing <br />)dwaypavement. The project will include the removal <br />J replacement of existing streets. Various <br />dacement pavement strategies will be investigated to <br />tennine the most cost effective and maintainable <br />atment. Minor concrete repair to severely damaged <br />missing curbs, gutters, sidewalks, and wheelchair <br />nos will also be included. <br />PROJECT NEED: <br />The local street network has 316 miles citywide. In <br />2007 the City embarked on an extensive citywide <br />improvement plan to rehabilitate and slurry seal the <br />majority of the network. By the end of 2015, the City <br />has completed rehabilitating all asphalt residential <br />streets and currently working toward improving all <br />residential and industrial concrete streets. <br />PROJECT COSTS FY 1920 FY 2021 FY 2122 FY 2223 FY 2324 FY 2425 FY 2526 <br />C0'5V( Oo0 $2,092797 <br />TOTAL $2, 092,797 <br />SOURCE OF FUNDS FY 19/20 FY 2021 FY 2122 FY 2223 FY 2324 FY 2425 FY25M <br />GAS TAX $2,092797 <br />TOTAL $2, 092,797 <br />AGENCY DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Sean Thomas, Senior Civil Engineer 12-Jan-2020 <br />-1- <br />20C-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.