Laserfiche WebLink
Exhibit 7 <br />12.1 The intent of these specifications is known by the City of Santa Ana and SAPRF. Any <br />questions relating to the interpretation of these specifications must be addressed, in writing, <br />prior to the start of work. The Contractor agrees that interpretations of this contract after <br />the start of work are at the sole discretion of the Director's Representative, and the <br />Contractor shall abide by all such interpretations <br />13.0 PROTECTION OF EXISTING FACILITIES AND STRUCTURES <br />13.1 The Contractor shall exercise due care in protecting from damage all existing facilities, <br />structures, and utilities, both above surface and underground on the City's property. Any <br />damage to City, Santa Ana Park and Recreation Facilities (SAPRF), or private property <br />caused by the Contractor's neglect shall be corrected and paid for by the Contractor at no <br />cost to the City of Santa Ana or SAPRF. The City of Santa Ana and/or Director's <br />Representative shall make the determination of fault. The Director's Representative <br />reserves the right to issue a Stop Work Notice if the Contractor does not promptly repair <br />any damage, within twenty-four (24) hours of the damage incurred. <br />13.2 If the Directors Representative requests or directs the Contractor to perform work in a given <br />area, it will be the Contractor's responsibility to verify and locate any underground systems <br />(i.e. utility lines) and take responsibility for taking reasonable precaution when working in <br />these areas. <br />13.3 Contractor shall call Underground Alert (800) 422-4133) at least two working days prior <br />to digging for line locations. Any damage or problems shall be reported immediately to <br />the Director's Representative and the City of Santa Ana. If the Contractor discovers <br />something unexpected or a unique problem occurs, he should stop work and immediately <br />contact an authorized Director's Representative for a timely resolution of the problem. <br />14.0 SUBSTITUTIONS <br />14.1 Whenever a specific type of material is specified, no substitutions shall be allowed without <br />written consent of the SAPRF representative. <br />15.0 CERTIFICATION & APPLICATION OF MATERIALS <br />15.1 All materials shall be delivered on the site in original containers. Materials shall be subject <br />to inspection by the Director's Representative. The Director's Representative will not <br />approve materials not meeting the SAPRF standards, and Contractor shall return any such <br />non -satisfactory items at his/her cost. <br />15.2 No materials shall be applied prior to the Director's Representative verifying the specified <br />quantities of materials. Furthermore, should the Contractor apply materials before the <br />Director's Representative verifies correct materials and quantities, the Contractor shall not <br />receive credit for the applied materials. The Contractor shall then reorder and deliver the <br />materials, thereby not receiving credit for the applied materials. <br />16.0 CONTRACTOR NEGLECT <br />City of SAr t19-094 <br />